Pipeline contractor software: progress, testing & QA

Pipeline contractors: QA that's done when the trench is. Every metre laid, tested and signed off.

Progress gets tallied from foreman diaries. Test charts sit in a folder in the site shed and ITPs get signed weeks after backfill. We build progress and QA tracking systems for pipeline contractors that record every run, joint, test and hold point as the job goes. Then we host them and look after them.

Looking for pipeline progress, testing and QA tracking software?

Pipeline jobs live and die on metres laid and paperwork closed out. Most contractors run progress in a spreadsheet the PM updates on Friday arvo, keep test charts in a ring binder and chase ITP signatures at the end of the job. The work in the ground is fine. Proving it is what costs you weeks and holds up your money.

Wollopit builds custom pipeline software around how your crews actually work. Supervisors log metres by chainage on a phone, tests are recorded against the section they cover and hold points get signed before the trench is closed. Joints trace back to the operator and the pipe batch. Claims come straight from logged quantities and the QA pack builds itself as you go. We connect to the project and accounting tools you already use and look after the lot on our own servers.

01The problems

What we hear from pipeline contractors

Does your pipeline contracting company have these problems? Here's how we'd fix them.

Most pipeline contractors we talk to lay good pipe and lose weeks proving it. The paperwork is always running behind the excavator.

  • The problemProgress guessed from diariesMetres laid are tallied from foreman notes at the end of the week and nobody fully trusts the number.
    How we fix itCrews log metres laid by chainage on a phone each day. The office sees a live total against the program.
  • The problemTest records scatteredHydrostatic test charts, gauge calibration certs and results sit in folders, inboxes and the glovebox of a ute.
    How we fix itEvery pressure test logged against the section it covers with the chart, gauge cert and witness sign-off attached.
  • The problemITPs signed lateHold points get signed after backfill or not at all. The client's rep finds out at audit.
    How we fix itITPs on the device with hold and witness point alerts. Nothing gets backfilled until the right person has signed.
  • The problemWelds and joints untraceableNobody can say who did joint 214, with which pipe batch or whether it was ever inspected.
    How we fix itEvery weld or fusion joint linked to the operator, their ticket, material heat numbers and its location on the line.
  • The problemMaterial certs go missingPipe, fittings and valves arrive with mill certs that end up in a drawer if they're kept at all.
    How we fix itDeliveries booked in with certs and batch numbers, then tracked to the section where each length went in the ground.
  • The problemClaims argued every monthProgress claims get knocked back because the evidence is a spreadsheet and a few blurry photos.
    How we fix itClaims built from logged quantities, geotagged photos and passed tests, ready for the client's format.
  • The problemDefects lost in emailA non-conformance gets raised, an email goes out and three weeks later nobody knows if it was fixed.
    How we fix itNCRs raised on site with photos, assigned an owner and tracked to close-out against the chainage.
  • The problemTickets out of dateA welder's ticket lapsed last month and the site only found out when the client asked for it.
    How we fix itOperator tickets, procedure qualifications and inductions tracked with expiry alerts before they cause a stand-down.
  • The problemDiaries that get wetWeather, plant hours, delays and visitors scribbled in a book that lives on the dash of the ute.
    How we fix itA daily site diary on the phone with weather, plant, labour, delays and photos signed off by the supervisor.
  • The problemNobody can see the whole lineThe PM rings three supervisors to find out where each crew is up to.
    How we fix itA line map showing laid, tested, backfilled and reinstated sections coloured by status.
  • The problemHandover takes monthsQA packs are pulled together at the end from every folder, inbox and USB stick on the job.
    How we fix itQA packs that build themselves as the job runs, indexed by section and ready the day you finish.
02What we build

Solutions

What we build for pipeline contractors. Usually all talking to each other.

Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.

01

Progress tracking

Metres laid by chainage, day and crew with a live total against the program.

02

Line status map

Every section on a map coloured by laid, tested, backfilled and reinstated.

03

Test register

Pressure tests, charts, gauge certs and results stored against each section.

04

Digital ITPs

Your own ITPs on site with hold points, witness points and sign-off records.

05

Joint & weld records

Every joint traced to operator, ticket, materials and location.

06

Material & cert tracking

Pipe and fittings booked in with certs and batch numbers then tracked to install.

07

NCR register

Non-conformances raised with photos, assigned and closed out on the line.

08

Daily site diaries

Weather, labour, plant, delays and photos logged on a phone each shift.

09

Progress claims

Claims built from logged quantities, photos and passed tests.

10

Tickets & competencies

Operator tickets, inductions and qualifications with expiry alerts.

11

Plant pre-starts

Excavator, fusion machine and pump pre-starts with defects flagged to the workshop.

12

Client portal

A login for the client's rep to see progress, tests and sign hold points.

13

QA handover packs

Close-out documents compiled by section as you go.

03The systems

The big ones

Your whole line, on one system.

These are the systems pipeline contractors ask us about most. Each works on its own and they get properly useful once they share the same chainage.

Progress tracking

Know where every crew is up to without ringing them.

Supervisors log metres laid, bedding, backfill and reinstatement by chainage from their phone. The office sees a live total against the program and a map of the line coloured by status.

  • Metres logged by chainage on a phone
  • Laid, tested, backfilled and reinstated stages
  • Live totals against the program
  • Line map coloured by status
  • Progress per crew and per day
  • Geotagged photos on every entry
  • Works offline in the trench
  • Daily diary with weather and delays
  • Plant and labour hours per shift
  • Weekly reports for the client

Test register

Every test filed against the pipe it proved.

Pressure tests, leak tests and CCTV inspections logged against the section they cover. Charts, gauge certs and witness sign-offs sit right with the result so nobody goes hunting at handover.

  • Hydrostatic and pneumatic test records
  • Test charts and data files attached
  • Gauge calibration certs with expiry
  • Witness sign-off on the device
  • Pass or fail with retest history
  • CCTV and swab results per section
  • Disinfection and water quality records
  • Sections blocked until tested
  • Test schedule shared with the client

Digital ITPs & NCRs

Hold points signed before the trench is closed.

Your ITPs on the device with every check, hold and witness point in order. Supervisors get alerted before a hold point is due. Anything that fails becomes an NCR with photos and an owner.

  • Your own ITP templates
  • Hold and witness point alerts
  • Client rep sign-off on site
  • Photos and measurements on each check
  • Backfill blocked until signed
  • NCRs raised from a failed check
  • Owner, due date and close-out tracking
  • Full audit trail of who signed what
  • Works offline with sync later

Joint & material traceability

Every joint traced to who made it and what it's made of.

Each weld or fusion joint records the operator, their ticket, the pipe batch and where it sits on the line. Material comes in with its certs and gets followed all the way into the ground.

  • Joint numbers by chainage
  • Operator and ticket on every joint
  • Fusion machine logs imported where available
  • Pipe and fitting batch numbers
  • Mill certs and supplier certs stored
  • Deliveries booked in on site
  • Inspection results per joint
  • Ticket expiry alerts
  • Search any joint in seconds

Claims & handover

Claims that stand up. QA packs that are already done.

Progress claims come straight from logged quantities with photos and passed tests behind every line. The QA pack builds itself by section as the job runs, so handover is a download instead of a month of chasing.

  • Claims from logged quantities
  • Evidence attached to each claim line
  • Variations tracked separately
  • Exports for Payapps or the client's format
  • Invoices into Xero or MYOB
  • QA pack indexed by section
  • ITPs, tests, joints and certs compiled
  • As-built chainage data exported
  • Client portal for reps to review
04How it changes

Before and after

A pipe run, wolloped.

Here's how one section of line could change from trench to handover. Every contractor runs differently, so we map yours first.

Before

  1. Metres tallied from the foreman's diary on Friday
  2. Test chart filed in a binder in the site shed
  3. ITP signed a fortnight after backfill
  4. Joint records on a paper sheet in the ute
  5. Claim argued over a spreadsheet
  6. QA pack chased for months at the end

After

  1. Progress logged by chainage on the day
  2. Test attached to the section it covers
  3. Hold point signed on site before backfill
  4. Every joint linked to operator and pipe batch
  5. Claim built from logged quantities and photos
  6. QA pack ready the day the line is finished
05Services

Everything under one roof

Software, websites and systems for pipeline contractors.

Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.

Custom software for pipeline contractors

Built around how your pipeline contracting company actually runs: progress tracking, line status map and the admin in between, in one system you own.

Websites for pipeline contractors

Fast, hand-built websites that rank for the searches your customers make and turn visits into enquiries, bookings or orders.

Pipeline contracting company system upgrades

Running on spreadsheets, old software or a platform you've outgrown? We move your data across and upgrade in stages so the business never stops.

Apps and portals for pipeline contractors

Test register and digital ITPs: customer and staff portals that work on any phone without an app store.

Integrations and automation

We connect Procore, Aconex and Xero so information moves on its own and nobody retypes it.

Hosting, support and care

Managed hosting, updates, backups and security for your pipeline contracting company, looked after by the people who built it.

06Integrations

Connections

Plays nicely with what you already use.

We connect to the project, document and accounting tools you rely on. We work alongside platforms you're happy with or replace the ones holding you back.

  • Procore
  • Aconex
  • Xero
  • MYOB
  • Payapps
  • Assignar
  • HammerTech
  • SafetyCulture
  • Microsoft 365
  • SharePoint
  • Google Workspace
  • Dropbox
  • Deputy
  • Employment Hero
  • Esri ArcGIS
  • Google Maps
  • Power BI
  • Stripe
  • Twilio SMS
07How we work

The process

Some people dip their toe in. We turn up in a rebreather.

We get properly below the surface of your pipeline contracting company: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.

  1. 01

    Think

    We get out on the line with your supervisors and sit with your QA and commercial people to see where the paperwork falls behind.

  2. 02

    Archi-tech

    We plan it before writing code: your chainages, ITPs, tests, joints, claims, client requirements, hosting and cost.

  3. 03

    Build

    Real engineering, shown to you early and often. Usually progress or ITPs first, so you get a win on the current job.

  4. 04

    Look after

    We host it, maintain it and keep improving it. When something breaks you call the people who built it.

08Questions

FAQ

Things pipeline contractors ask us.

Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.

Can we use our own ITPs and test procedures?

Yes. We build your existing ITPs, checklists and test forms into the system so crews see the same checks they already know. Different templates for different clients or pipe types are no problem.

Does it work where there's no signal?

Yes. Supervisors can log progress, tests and ITP checks offline in the trench. Everything syncs once the phone finds signal again.

Can the client's rep sign hold points in it?

Yes. Client reps and superintendents can get their own login to review progress, see test results and sign hold or witness points on site.

Can it work with our project and accounting systems?

Usually, yes. We can connect to tools like Procore or Aconex for project documents and Xero or MYOB for accounts. Then we build the site-facing progress and QA parts around them.

We already use a site platform. Do we have to switch?

No. If Assignar, HammerTech or another platform is doing its job we build around it and fill the gaps in progress, testing and QA. If something is holding you back we'll show you what replacing it would involve before anything changes.

How much does a pipeline QA system cost?

It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.

How long does it take?

Smaller pieces like a test register or daily diary can be quick. Bigger systems are planned in stages so you get the first win early instead of waiting for everything at once.

Who looks after it once it's built?

We do. We host it on our own managed servers and keep it updated and secure. When you need something you ring the people who built it.

We already have systems. Can you upgrade them instead of starting again?

Usually, yes. We keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.

Contact

Got a pipeline contracting company problem? Consider it wolloped.

Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.

I've got