Piling contractor software: pile logs, reports & as-builts

Piling contractors: pile logs that don't live in the ute. Every pile recorded, checked and signed off.

Pile logs get scribbled on paper, depths get retyped at night, extra metres never get claimed and engineers wait weeks for as-builts. We build site apps and reporting tools for piling contractors that capture every pile once at the rig and turn it into the report, the variation and the invoice. Then we host them and look after them.

Looking for pile logging software for piling contractors?

Every pile has a design depth, an actual depth, a toe level, concrete volumes, a reo cage and an inspection to record. Driven piles need set records and screw piles need torque readings. Most crews still do it on a paper log clipped to the rig, then the supervisor types it into a spreadsheet after a 12 hour day. Meanwhile the extra metre you drilled through rock on Tuesday is already forgotten.

Wollopit builds custom piling software around how your crews actually work. Log piles on a tablet at the rig, even with no signal. Design data loads per pile so short or deep piles get flagged straight away. Extra depth turns into a variation claim with the evidence attached. Concrete dockets match to piles, prestarts happen on a phone and the as-built report builds itself as the job goes. We connect the tools you already use and look after the lot on our own servers.

01The problems

What we hear from piling contractors

Does your piling company have these problems? Here's how we'd fix them.

Most piling outfits we talk to are brilliant at getting piles in the ground and run the paperwork on clipboards, phone photos and a supervisor who never gets home on time.

  • The problemPaper pile logsLogs get wet, muddy or lost in the ute, then someone spends the night retyping them into a spreadsheet.
    How we fix itPile records entered on a tablet at the rig with photos, synced to the office the moment there's signal.
  • The problemDesign vs actual unclearNobody spots a short pile or a wrong diameter until the report's being written weeks later.
    How we fix itDesign depths, diameters and toe levels loaded per pile with flags the second an actual doesn't match.
  • The problemExtra depth never claimedThe crew drilled two extra metres into rock and the variation gets argued months later with no proof.
    How we fix itExtra-over metres, rock sockets and refusals logged with photos and turned into variation claims as they happen.
  • The problemEngineer sign-offs chasedBase inspections are booked by phone and the rig sits idle while the geotech's still on the highway.
    How we fix itInspection requests sent from the app with ETA texts and digital sign-offs recorded against each pile.
  • The problemConcrete volumes don't reconcileDockets live in the glovebox and the pour totals never quite match the pile count.
    How we fix itConcrete dockets photographed and linked to piles, with theoretical vs actual volume and over-pour tracked.
  • The problemSet and torque on a calculatorDriven pile sets and screw pile torque readings get jotted on a notepad and worked out later.
    How we fix itSet, blow counts and torque logged per pile, with capacity checks against the design worked out on the spot.
  • The problemPrestarts in a soggy bookRig prestart books are half filled in and nobody notices a service is overdue until something breaks.
    How we fix itPhone prestarts per rig, defects sent to the workshop and services due by engine hours.
  • The problemWhich rig is where?Rigs, floats, cranes and crews juggled on a whiteboard and in the boss's head.
    How we fix itOne schedule for rigs, crews, floats and support gear, with clashes and travel shown on a map.
  • The problemServices plans not on siteBYDA plans sit in someone's inbox while the crew sets up over a gas main.
    How we fix itService plans, set-out drawings and SWMS attached to the job and opened at the rig.
  • The problemAs-builts take weeksFinal reports and pile schedules are pulled together by hand at the end of the job.
    How we fix itAs-built reports and pile registers generated from the logs as the job progresses.
  • The problemBuilders ringing for progressThe site manager rings every afternoon to ask how many piles are done.
    How we fix itA client portal showing piles complete, inspections passed and reports ready to download.
02What we build

Solutions

What we build for piling contractors. Usually all talking to each other.

Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.

01

Site pile logs

Depths, toe levels, diameters, soil notes, photos and times captured at the rig, offline if needed.

02

Pile schedules

Design data loaded per pile from the engineer's schedule and tracked to completion.

03

Design vs actual flags

Short, deep or off-diameter piles flagged the moment they're logged.

04

Variation & extra-over claims

Extra metres, rock sockets and delays turned into claims with the evidence attached.

05

Driven & screw pile records

Sets, blow counts, torque and final capacities per pile with checks against design.

06

Inspection sign-offs

Engineer, geotech and supervisor approvals recorded digitally against each pile.

07

Pile testing register

Integrity, load and PDA test results stored with the pile they belong to.

08

Concrete & reo reconciliation

Dockets matched to piles, over-pour shown and cages tracked from fabrication to the hole.

09

Rig prestarts & maintenance

Daily checks on a phone, defects to the workshop and services due by hours.

10

Rig & crew scheduler

Rigs, crews, floats and cranes on one board with travel and clashes shown.

11

Timesheets & day dockets

Crew hours and day works signed by the client on site, ready for payroll and invoicing.

12

As-built reports

Branded pile reports and registers produced straight from site data.

13

Client portal

Builders and engineers see progress and download reports without ringing you.

14

Quoting from geotech

Pile counts, expected depths and rig time from the geotech report into a fast, consistent quote.

03The systems

The big ones

Your whole piling job, on one system.

These are the systems piling contractors ask us about most. Each one works on its own and they get properly useful when they're joined up.

Site pile logs

Log the pile once. At the rig.

A tablet app built for gloves, glare and no signal. The operator or leading hand picks the pile off the schedule, records depths, levels and notes as they drill and snaps photos of the hole and the cage. It syncs to the office when it finds signal.

  • Pick piles from the loaded schedule
  • Start and finish times per pile
  • Actual depth, toe and cut-off levels
  • Soil and rock notes as you go
  • Photos of the hole, base and cage
  • Works offline on site
  • Bored, CFA, driven and screw piles
  • Big buttons for gloved hands
  • Daily summary sent to the office

Design vs actual & variations

Every extra metre, claimed with proof.

Design depths and diameters sit against every pile so the system spots differences the moment they're logged. Extra depth, rock sockets, refusals and standby time become variation claims with photos, times and sign-offs attached, ready to send before anyone forgets.

  • Design data loaded per pile
  • Short and deep pile flags
  • Extra-over metres totalled per job
  • Rock socket and refusal records
  • Standby and delay time logged
  • Photos and timestamps as evidence
  • Client sign-off on the spot
  • Variation claims in your template
  • Claims pushed to Payapps or invoicing

Concrete & reo

Dockets that finally match the piles.

Photograph the docket at the truck and link it to the piles it filled. Theoretical volumes come from the diameter and depth, so over-pour shows up straight away. Reo cages are tracked from fabrication to the hole.

  • Docket photos linked to piles
  • Theoretical vs actual volume
  • Over-pour per pile and per job
  • Truck arrival and pour times
  • Slump and test cylinder records
  • Cage IDs matched to piles
  • Cage delivery and lengths checked
  • Supplier totals for month end

Rigs, crews & prestarts

Every rig, crew and float on one board.

See which rig is on which job this week and next, who's crewing it and when the float is booked to move it. Prestarts happen on a phone and defects go straight to the workshop. Services are due by engine hours so nothing gets missed.

  • Rig and crew scheduling board
  • Float, crane and support gear bookings
  • Jobs and travel on a map
  • Phone prestarts per rig
  • Defects sent to the workshop
  • Services due by engine hours
  • Tickets and licences per operator
  • SMS job details to the crew
  • Timesheets to payroll

Sign-offs, as-builts & portal

The as-built report writes itself.

Inspections are requested from the rig and signed off on screen, with test results stored against the pile. Because every pile is already logged, the as-built report and pile register are ready the day the last pile is poured. Builders and engineers log in to see progress for themselves.

  • Inspection requests from the rig
  • Engineer and geotech digital sign-off
  • Integrity and load test results stored
  • As-built pile register per job
  • Branded PDF reports
  • Progress shown on the site plan
  • Client portal for builders and engineers
  • Documents shared to Procore or Aconex
  • Records kept for future claims
04How it changes

Before and after

A pile log, wolloped.

Here's how a day of bored piers could change. Every piling outfit is different, so we map yours first.

Before

  1. Log written on wet paper at the rig
  2. Extra metres into rock noted on the back of a docket
  3. Engineer rung for a base inspection, rig waits
  4. Dockets shoved in the glovebox
  5. Depths retyped at night
  6. As-builts compiled by hand at the end of the job

After

  1. Pile logged on a tablet as it's drilled
  2. Deep pile flagged and a variation drafted with photos
  3. Inspection requested from the app, signed off on screen
  4. Docket photographed and linked to the piles
  5. Data in the office before the crew packs up
  6. As-built report ready the day the last pile is poured
05Services

Everything under one roof

Software, websites and systems for piling contractors.

Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.

Custom software for piling contractors

Built around how your piling company actually runs: site pile logs, pile schedules and the admin in between, in one system you own.

Websites for piling contractors

Fast, hand-built websites that rank for the searches your customers make and turn visits into enquiries, bookings or orders.

Piling company system upgrades

Running on spreadsheets, old software or a platform you've outgrown? We move your data across and upgrade in stages so the business never stops.

Apps and portals for piling contractors

Design vs actual flags and variation & extra-over claims: customer and staff portals that work on any phone without an app store.

Integrations and automation

We connect Xero, MYOB and Procore so information moves on its own and nobody retypes it.

Hosting, support and care

Managed hosting, updates, backups and security for your piling company, looked after by the people who built it.

06Integrations

Connections

Plays nicely with what you already use.

We connect to the tools you rely on, work alongside construction platforms your builders insist on and replace the spreadsheets holding you back.

  • Xero
  • MYOB
  • Procore
  • Aconex
  • Assignar
  • HammerTech
  • SafetyCulture
  • Payapps
  • Microsoft 365
  • Google Workspace
  • Dropbox
  • Deputy
  • Employment Hero
  • Teletrac Navman
  • Before You Dig Australia
  • Stripe
  • Twilio SMS
  • Google Maps
07How we work

The process

Some people dip their toe in. We turn up in a rebreather.

We get properly below the surface of your piling company: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.

  1. 01

    Think

    We spend time on site with your crews, in the workshop and in the office, then work out where the paperwork is costing you money.

  2. 02

    Archi-tech

    We plan it before writing code: your pile types, schedules, logs, variations, concrete, rigs, reports, hosting and cost.

  3. 03

    Build

    Real engineering, shown to you early and often. Usually the site pile log first, so you get a win on your next job.

  4. 04

    Look after

    We host it, maintain it and keep improving it. When something breaks you call the people who built it.

08Questions

FAQ

Things piling contractors ask us.

Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.

Does the app work on sites with no signal?

Yes. Pile logs, photos and prestarts save on the tablet and sync as soon as it finds signal. Nothing gets lost because the site is in a hole.

Does it handle driven, screw and CFA piles as well as bored piers?

Yes. Each pile type gets the fields it needs, like sets and blow counts for driven piles, torque for screw piles and pump pressures and volumes for CFA.

Can it help us claim extra depth?

Yes. When an actual depth goes past design the system flags it and builds a variation with the photos, times and sign-off attached, so you're not arguing about it months later.

Do engineers and builders need to download anything?

No. They can sign off on your tablet at the hole or approve from a link on their phone. The client portal works in any browser.

Can you match our existing pile log and report templates?

Yes. We build the logs and reports to look like the ones your engineers and builders already accept, just without the retyping.

Do we have to switch from Procore, Assignar or our accounting software?

No. If something is doing its job we build around it and connect to it. Pile data, documents and invoices flow to Procore, Aconex, Xero or MYOB where they need to go.

How much does piling software cost?

It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.

How long does it take?

A site pile log can be running quickly. Bigger systems are planned in stages so you get the first win early instead of waiting for everything at once.

Who looks after it once it's built?

We do. We host it on our own managed servers and keep it updated, backed up and secure. When you need something you ring the people who built it.

We already have systems. Can you upgrade them instead of starting again?

Usually, yes. We keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.

Contact

Got a piling company problem? Consider it wolloped.

Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.

I've got