Steel erection software: lift plans, crews & sequencing

Steel erectors: plan the lifts before the crane turns up. Sequences, lifts and crews in one plan.

The erection sequence is a highlighted drawing in the ute, the crane gets booked by phone and crews get shuffled by text the night before. We build planning systems for steel erectors that line up members, lifts, cranes and crews so every day on site runs to plan. Then we host them and look after them.

Looking for lift planning and crew software for steel erection?

Steel erection lives and dies on the sequence. Steel has to come off the truck in the right order, the crane has to be booked for the right day with the right capacity and the crew has to turn up with current dogging, rigging and EWP tickets. Most erectors hold all of that together with marked-up drawings, a phone full of texts and a supervisor who never stops ringing people.

Wollopit builds custom software around how your crews actually work. One plan ties every member to a grid, level and lift. Deliveries get checked against it on arrival. Lift plans come from templates. Crews get allocated with their tickets checked. Progress gets ticked off as steel goes up, so your claims match the site. We connect to Tekla, Xero, MYOB and whatever your builders make you use, then host and look after the lot.

01The problems

What we hear from steel erectors

Does your steel erection company have these problems? Here's how we'd fix them.

Most steel erectors we talk to are brilliant at getting a frame up safely. The planning, paperwork and chasing around it is what eats the nights and weekends.

  • The problemThe sequence lives on paperThe erection sequence is a highlighted drawing in the supervisor's ute. If he's off sick, so is the plan.
    How we fix itA digital sequence by grid, level and lift that the whole crew can see on a tablet or phone.
  • The problemSteel arrives out of orderThe truck turns up with level three columns before the level one beams and members end up in the wrong pile.
    How we fix itDeliveries matched to the sequence, with members checked off on arrival and the fabricator told what's missing.
  • The problemLift plans rebuilt every timeEvery pick gets a fresh Word document with weights, radius and crane details typed in again.
    How we fix itLift plans built from templates with member weights, rigging, radius and crane capacity pulled straight in.
  • The problemCrane bookings by phoneThe crane gets booked for Tuesday, the steel lands Wednesday and you pay for the standing time.
    How we fix itCrane bookings tied to the sequence and delivery dates, so a slip in one flags the others straight away.
  • The problemCrews sorted by text at 9pmWho's on which job gets worked out the night before by text and somebody always misses the message.
    How we fix itA crew board with jobs, start times and site details sent to phones, with confirmations coming back.
  • The problemTickets expire unnoticedSomeone rocks up with a lapsed dogging ticket or an expired site induction and the builder sends them home.
    How we fix itA licence register that flags expiries weeks ahead and blocks allocating anyone without the right ticket.
  • The problemPrestarts on soggy paperEWP and crane prestarts, SWMS sign-ons and toolbox talks end up crumpled in the glovebox.
    How we fix itPrestarts, SWMS sign-ons and toolbox talks on phones, timestamped and filed against the job.
  • The problemSite fixes never get chargedHoles drilled on site and cleats fixed for fabricator mistakes never make it onto an invoice.
    How we fix itDayworks dockets and variations logged on site with photos and signed off by the builder on the spot.
  • The problemQA handover is a scavenger huntBolt tensioning records, ITPs and photos are scattered across phones while the builder holds your retention.
    How we fix itQA records captured as you go and a handover pack built in a couple of clicks.
  • The problemWind days nobody recordsLifts get called off for wind and nobody writes it down, so the delay claim is guesswork.
    How we fix itA weather and delay log with times, wind readings and photos ready for extension of time claims.
  • The problemProgress is hard to proveTonnes erected get estimated for the monthly claim and the builder's QS argues every line.
    How we fix itMembers ticked off as erected so claims are built from what's actually standing on site.
02What we build

Solutions

What we build for steel erectors. Usually all talking to each other.

Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.

01

Erection sequencing

Every member sequenced by grid, level and lift, imported from your Tekla or fabricator steel list.

02

Lift plans

Templated lift plans with member weights, rigging gear, radius, crane capacity and sign-offs.

03

Delivery matching

Loads checked against the sequence on arrival, with shortages flagged to the fabricator.

04

Crane bookings

Crane hire bookings linked to the sequence so changes ripple through without a single phone call.

05

Crew allocation

Drag crews onto jobs, send start times to phones and see who's confirmed.

06

Licence register

Dogging, rigging, crane, EWP and white cards plus site inductions with expiry alerts.

07

Prestarts & SWMS

Plant prestarts, SWMS sign-ons and toolbox talks on any phone, even with no signal.

08

Plant register

EWPs, scissor lifts, welders and rigging gear with service dates, inspections and tags.

09

Dayworks & variations

Site dockets with photos and builder signatures, turned into variations without the retyping.

10

QA & ITP records

Bolt torque and tensioning, hold points, inspections and photos captured against each member.

11

Weather & delay log

Wind holds, rain days and access delays recorded with times and evidence.

12

Progress claims

Claims built from members actually erected, pushed to Xero or MYOB.

13

Builder portal

Give builders a login to see progress, sign dockets and download handover packs.

03The systems

The big ones

Your whole frame, on one system.

These are the systems steel erectors need most. Each one works on its own and they get properly useful once they're joined up.

Sequencing & deliveries

Every member in order before the first truck rolls in.

Bring in the steel list from Tekla or the fabricator and every member gets a grid, level and lift. When loads arrive the crew ticks them off against the sequence, so you know what's on the ground and what's still missing.

  • Steel list import from Tekla or CSV
  • Members by grid, level and lift
  • Colour-coded sequence on the drawings
  • Delivery schedule from the fabricator
  • Scan or tick members off the truck
  • Shortages flagged to the fabricator
  • Laydown area notes and photos
  • Out-of-sequence alerts for the supervisor

Lift planning & cranes

Lift plans in minutes. Cranes booked for the right day.

Pick a member and the lift plan fills itself with the weight, rigging and radius from your templates. Crane bookings sit against the sequence so when steel slips a day the crane booking gets flagged before you pay for standing time.

  • Lift plan templates by crane and pick type
  • Member weights pulled from the steel list
  • Radius, capacity and rigging gear recorded
  • Critical lift flags and sign-off steps
  • Crane bookings against sequence dates
  • Clashes flagged when deliveries move
  • Crane hire contacts and confirmations
  • Lift plans printed or shared as PDF

Crews & tickets

The right crew on the right job with the right tickets.

A crew board shows every job, every rigger and every supervisor for the week. Allocate someone without a current dogging ticket or site induction and the system tells you before the builder does.

  • Weekly crew board by job
  • Start times and site details sent by SMS
  • Confirmations back from the crew
  • High risk work licences on file
  • White cards and site inductions
  • Expiry alerts weeks ahead
  • Blocks allocation without the right ticket
  • Timesheets out to Deputy, Xero or MYOB

Site safety & QA

Prestarts, SWMS and QA captured as you go.

Crews do their EWP and crane prestarts, SWMS sign-ons and toolbox talks on their phones before the first lift. Bolt tensioning, inspections and hold points get recorded against each member so the handover pack is mostly built by the time you finish.

  • Plant prestarts on any phone
  • SWMS sign-on with signatures
  • Toolbox talks and attendance
  • Works offline and syncs later
  • Bolt torque and tensioning records
  • ITPs and hold point sign-offs
  • Photos tagged to members and grids
  • Handover packs in a couple of clicks
  • Incident and near miss reports

Claims & variations

Claim what's standing. Charge for every fix.

Progress claims come from members actually erected, not a guess at tonnes. Dayworks dockets and variations get logged on site with photos and the builder's signature, so fabricator fixes and extra work finally get paid.

  • Progress by member, tonnes or stage
  • Monthly claims from erected steel
  • Dayworks dockets on site
  • Builder signatures on the phone
  • Variations with photos and notes
  • Backcharges to fabricators
  • Weather and delay log for EOT claims
  • Invoices straight into Xero or MYOB
04How it changes

Before and after

A steel frame going up, wolloped.

Here's how a typical lift day could change. Every steel erector runs a bit differently, so we map yours first.

Before

  1. Highlight the drawing in the ute
  2. Retype the lift plan in Word
  3. Ring the crane company to check the booking
  4. Text the crew at 9pm and hope they read it
  5. Prestarts on paper in the glovebox
  6. Estimate tonnes for the claim

After

  1. Sequence live on the tablet
  2. Lift plan built from a template
  3. Crane booking flagged when steel moved
  4. Crew booked with tickets checked and confirmed
  5. Prestarts done on phones before the first pick
  6. Claim built from erected members
05Services

Everything under one roof

Software, websites and systems for steel erectors.

Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.

Custom software for steel erectors

Built around how your steel erection company actually runs: erection sequencing, lift plans and the admin in between, in one system you own.

Websites for steel erectors

Fast, hand-built websites that rank for the searches your customers make and turn visits into enquiries, bookings or orders.

Steel erection company system upgrades

Running on spreadsheets, old software or a platform you've outgrown? We move your data across and upgrade in stages so the business never stops.

Apps and portals for steel erectors

Delivery matching and crane bookings: customer and staff portals that work on any phone without an app store.

Integrations and automation

We connect Tekla Structures, Trimble Connect and Bluebeam Revu so information moves on its own and nobody retypes it.

Hosting, support and care

Managed hosting, updates, backups and security for your steel erection company, looked after by the people who built it.

06Integrations

Connections

Plays nicely with what you already use.

We connect to the tools you and your builders already use. Keep what works and we'll build around it.

  • Tekla Structures
  • Trimble Connect
  • Bluebeam Revu
  • Procore
  • Aconex
  • HammerTech
  • SafetyCulture
  • Autodesk Construction Cloud
  • Xero
  • MYOB
  • Deputy
  • Employment Hero
  • Microsoft 365
  • Google Workspace
  • Dropbox
  • Twilio SMS
  • Google Maps
07How we work

The process

Some people dip their toe in. We turn up in a rebreather.

We get properly below the surface of your steel erection company: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.

  1. 01

    Think

    We spend time on site with your supervisors and in the office with whoever does the planning, then work out where the days are actually lost.

  2. 02

    Archi-tech

    We plan it before writing code: your steel lists, sequences, lift plans, cranes, crews, tickets, claims, hosting and cost.

  3. 03

    Build

    Real engineering, shown to you early and often. Usually the sequence or crew board first, so you get a win on your next job.

  4. 04

    Look after

    We host it, maintain it and keep improving it. When something breaks you call the people who built it.

08Questions

FAQ

Things steel erectors ask us.

Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.

Can it use our Tekla models and accounting software?

Usually, yes. We can bring in member lists and weights exported from Tekla and connect to Xero or MYOB for claims and payroll. That means nobody retypes the steel list.

Does it replace our lift planning sign-off?

No. It takes the retyping out of lift plans by pulling in weights, rigging and crane details, but your competent people still check and sign off every lift. The system just keeps the record.

Will it work on site with no signal?

Yes. Prestarts, sign-ons, dockets and QA records can be filled in offline and sync once a phone gets signal again.

Our builders make us use Procore or HammerTech. Do we have to switch?

No. We build around what works and what your builders require. Where those platforms allow it we can push records across so you're not entering things twice.

Can builders see our progress?

Yes. A builder portal can show erected steel, sign dockets and variations and let them download QA handover packs when the job wraps up.

How much does a steel erection system cost?

It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.

How long does it take?

Smaller pieces like a licence register or crew board can be quick. Bigger systems are planned in stages so you get the first win early instead of waiting for everything at once.

Who looks after it once it's built?

We do. We host it on our own managed servers and keep it updated and secure. When you need something you ring the people who built it.

We already have systems. Can you upgrade them instead of starting again?

Usually, yes. We keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.

Contact

Got a steel erection company problem? Consider it wolloped.

Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.