Site QA forms
Surface prep, profile, salts, conditions, DFT and photos captured on a tablet against each item.
Coatings contractors: QA records that survive the audit. Specs, readings and hold points in one place.
DFT readings live on paper, the ITP is in a binder in the ute and the handover pack gets stitched together at the end of the job. We build coating QA systems that capture every reading, coat and hold point as the work happens. Then we host them and look after them.
Every coatings job comes with a spec, an ITP and a client inspector who wants to see the numbers. Surface prep grade, profile, salts, steel temp, dew point, DFT per coat, batch numbers and recoat times all need recording against the right item. Most contractors still write it on a sheet in the blast shed or up a scaffold, then someone in the office retypes the lot into a spreadsheet and a Word template for handover.
Wollopit builds coating QA software around how your crews actually work. Readings go into a tablet against the right member and coat. Hold points lock the next step until they're released. The current spec is on every device and the handover pack builds itself from the site records. We connect the tools you already use like your gauges, Xero and Procore, then host and maintain it so you can get back to putting paint on steel.
What we hear from coatings contractors
Most coatings contractors do quality work and then spend days proving it. The paint's fine. It's the paperwork that fails the audit.
Solutions
Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.
Surface prep, profile, salts, conditions, DFT and photos captured on a tablet against each item.
Hold and witness points signed off in the system, with the next step locked until release.
Client inspectors review readings, witness points and release hold points online.
Current coating specs, systems and product data sheets for every job, with revision control.
Min and max overcoat times per product and conditions, with alerts to the crew lead.
Product, batch and expiry recorded per coat, linked to the items it went on.
Every member, spool or area tracked from blast to final coat, in the shop and on site.
Branded QA packs built from site data: readings, photos, batches, certs and sign-offs.
Defects raised with photos, assigned, repaired and closed out with evidence.
Gauges, hygrometers and holiday testers with cal dates, certs and service history.
Competencies, licences and site inductions with expiry alerts and allocation checks.
Crews, compressors and blast pots booked across shop and site jobs on one board.
Surface areas into litres, labour and blast hours, then a priced quote in minutes.
Coatings, thinners and abrasive on hand, shelf life alerts and reorders by job.
The big ones
These are the systems coatings contractors ask us about most. Each one works on its own and they get properly useful once they're joined up.
Site QA capture
Crews pick the item and coat on a tablet, then log conditions, prep and DFTs as they go. The form knows the spec, so a low reading or a dew point problem gets flagged before anyone moves on.
ITPs and hold points
Your ITP becomes a live checklist for every item or area. Hold points lock the next step until the inspector releases them. Witness points notify the client so nobody can say they weren't told.
Spec library
Coating specs, systems and product data sheets live in one library tied to each job. When the client issues a new revision the old one is marked superseded on every device. Recoat windows come straight from the product data.
Handover and reporting
Every reading, photo, batch number and sign-off is already in the system, so the QA pack is a button press. Use your own branded layout or match the format the client asked for.
Jobs, crews and gear
Schedule crews and equipment across shop and site jobs on one board. The system checks tickets and gauge calibration when you allocate them. Nobody turns up to a confined space job without the right paperwork.
Before and after
Here's how a hold point on a typical job could change. Every contractor runs things a bit differently, so we map yours first.
Everything under one roof
Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.
Crews record surface prep, ambient conditions, dew point, WFT and DFT readings on a phone or tablet against each item or area. It works offline inside tanks and on remote sites, then syncs when signal returns. Readings out of spec are flagged straight away instead of turning up at handover.
Build ITPs from the client's spec with hold and witness points in the right order. Inspectors are notified when a point is ready and sign off in their own portal. The next coat can't be logged until they do. Every sign-off is timestamped against the job.
Pull readings from your gauges through ElcoMaster or PosiSoft exports and tie each batch to the item, coat and location it belongs to. Averages, minimums and pass or fail against spec are calculated for you, so reports stop relying on someone retyping figures after a long shift.
Record paint batch numbers, abrasive lots and mixing details as product goes on, with recoat timers that warn crews before a window closes. If a batch is ever questioned you can see exactly which items it went on, on which day and under which conditions.
Estimate from surface areas, steel types, coating systems and access methods, with paint and abrasive quantities worked out from the spec. Compare estimates with actual hours and materials on finished jobs so your next tender is priced on real numbers rather than last year's guess.
Schedule crews by ticket and induction, track equipment calibration dates and see progress by item across shop and field work. Job costs, stock usage and timesheets feed through to Xero or MYOB while handover packs build themselves in the client's format.
Worth knowing
The best protective coatings software captures QA at the point of work, not on a clipboard later. Look for offline inspection forms that record environmental conditions, surface prep and DFT readings, ITPs with hold points clients can sign off, batch traceability, recoat timers and NCR tracking. Handover reports should come out in the client's format and calibration records for gauges and equipment should be easy to find at audit time.
Off-the-shelf tools play a real part. SafetyCulture is great for checklists and safety inspections, Procore and Aconex run document control on big projects and simPRO handles job management for plenty of trade businesses. ElcoMaster and PosiSoft are built for gauge data. The gap is usually proper coatings QA software: linking readings, batches, coats and hold points to each item and producing a handover pack the client accepts first time.
A custom or connected system means a reading taken inside a tank shows up in the report without being retyped. Inspectors sign off hold points from a coatings inspector portal, crews see when a recoat window is closing and the office can check QA status across every job at a glance. Handover stops being a week of assembling spreadsheets and photos and becomes something you generate when the last coat is signed off.
Start with the job that hurts most, often handover reports or ITP sign-offs. Build that, connect it to the gauge software, accounts and document systems you already run and prove it on a live job. Then add estimating, stock and crew compliance in stages. Coating inspection software for small business should earn its keep from the first project rather than asking you to change everything at once.
Connections
We connect to the tools you rely on, work alongside platforms you're happy with or replace the ones holding you back.
The process
We get properly below the surface of your protective coatings contractor: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.
We spend time in the blast shed, on site and in the office, then work out where the QA paperwork is actually costing you time.
We plan it before writing code: your specs, ITPs, forms, gauges, handover formats, hosting and cost.
Real engineering, shown to you early and often. Usually site QA forms first, so you get a win on your next job.
We host it, maintain it and keep improving it. When something breaks you call the people who built it.
FAQ
Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.
Often, yes. Gauges in the Elcometer and DeFelsko PosiTector ranges can export readings, which we can bring into the job record. We'll check what your gauges support during the Archi-tech step.
Yes. The site forms can work without signal and sync once the tablet is back in range, so readings aren't lost inside a tank or out on a pipeline.
Yes. Inspectors get their own login to review readings and photos, then release hold points or record witness points from any device. Every release is timestamped.
Yes. We can build reports in your own branding or match the layout a principal contractor or asset owner asks for, including per-stage packs.
No. If a platform is doing its job we build around it and connect to it. If it's holding you back we'll show you what replacing it would involve before anything changes.
It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.
Smaller jobs like site QA forms can be quick. Bigger systems are planned in stages so you get the first win early instead of waiting for everything at once.
Yes. Items can be tracked from blast and prime in the shop through to touch-ups and topcoat on site, with the full record following each item.
We do. We host it on our own managed servers and keep it updated and secure. When you need something you ring the people who built it.
It can sit beside it or take over your coating QA. SafetyCulture is good for safety checklists and you may well keep it for that. If your coating QA has outgrown generic forms we build readings, batches and ITPs properly and connect the two where it helps.
Yes. Each job carries its coating system from the spec library: coats, products, DFT ranges and recoat windows. Readings are checked against those limits as they are entered, so out-of-spec areas are flagged on site while the crew can still fix them.
Yes. We can build an estimator that works from surface areas, coating systems and access needs and calculates paint, abrasive and labour. It then compares each estimate with actual costs once the job is finished, so your pricing keeps getting sharper.
Yes. We work with contractors Australia-wide and run projects remotely through video calls and screen shares. In South East Queensland we can also come on site to see your shop, your crews and how QA actually gets done in the field.
Usually, yes. We keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.
Contact
Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.