wollopit Got a problem? →

Cladding panel tracking & façade project software

Cladding contractors: know where every panel is. Shop drawing to install, panel by panel.

Panels lost between the factory and the hoist, shop drawings on revision F and installs marked up with a highlighter on a printed elevation. We build panel tracking, QA, defect and claims systems for cladding contractors that follow every panel from drawing to fixed on the wall. Then we host them and look after them.

Looking for panel tracking software for cladding jobs?

A façade job is thousands of panels, each with its own code, finish, revision and spot on the building. Add subframe, brackets, flashings, sealant, access gear and a builder who wants a claim backed up by evidence. Most contractors hold it together with spreadsheets, highlighters on printed elevations, a site diary and a supervisor's very full phone.

Wollopit builds custom software for cladding contractors around how your jobs actually run. One system tracks every panel from shop drawing to fabrication, delivery and install. The same data builds your progress claims, your QA records and your handover pack. We connect the tools you already rely on, work alongside the builder's platform and look after the lot on our own servers.

01The problems

What we hear from cladding contractors

Does your cladding company have these problems? Here's how we'd fix them.

Most cladding contractors we talk to run tight crews and know their product inside out. The admin is what bites, usually at claim time or handover.

  • The problemPanels go missingNobody knows if panel E3-L7-042 is at the factory, on a truck or buried in the laydown yard under a tarp.
    How we fix itEvery panel scanned at each stage so anyone can look it up and see exactly where it is.
  • The problemRevisions cause reworkA panel gets cut to revision C when the shop drawing went to D last Tuesday. Now it's a reorder and a week lost.
    How we fix itDrawing revisions tied to each panel. Only the current revision can be released to fabrication and superseded ones are flagged.
  • The problemInstall progress on paperSupervisors mark up printed elevations, take photos on their own phones and ring it through at knock-off.
    How we fix itInstalls marked on a digital elevation from site with photos attached, so the office sees progress as it happens.
  • The problemDamaged panels argued overA scratched or dented panel is found on the scaffold two weeks after delivery. Nobody can prove when it happened.
    How we fix itDamage logged with photos at receipt and on the deck, with reorders raised straight away and a clear record of who's responsible.
  • The problemDeliveries arrive out of sequenceThe truck turns up with level 9 panels while the crew is on level 4 and the laydown area is already full.
    How we fix itDeliveries planned by elevation and level against the install program, booked into hoist and crane slots.
  • The problemProgress claims guessedClaims are worked out from rough counts and a walk around the building the day before they're due.
    How we fix itClaims built from panels actually installed, broken down by elevation and level, with photos to back them up.
  • The problemVariations never get claimedThe site manager asks for extra flashings on a walk-through. It gets done and nobody ever prices it.
    How we fix itSite instructions logged on the spot, priced in the office and tracked through to approval and claim.
  • The problemQA lives in a folderITPs, fixing inspections and sealant checks signed off on paper and scanned in weeks later, if at all.
    How we fix itDigital ITPs and hold points on a phone, tied to each elevation and drop, with sign-offs and photos stored against the job.
  • The problemCompliance chased at the endProduct certificates, test reports and batch numbers get hunted down when the certifier asks for them.
    How we fix itMaterial certificates and batch records attached to the panels they cover, so the compliance pack builds itself.
  • The problemDefects drag at handoverBuilder defect lists arrive as PDFs and emails with vague locations like 'north side, near the top'.
    How we fix itA defect register tied to panel IDs and elevations, assigned to crews and closed out with photos.
  • The problemCrews, tickets and access gearEWP licences expire, the swing stage inspection is overdue and nobody's sure which crew is on which drop tomorrow.
    How we fix itCrew allocation by drop, licence and ticket expiry alerts and access equipment logs and hire dates in one place.
02What we build

Solutions

What we build for cladding contractors. Usually all talking to each other.

Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.

01

Panel register

Every panel with its code, finish, size, revision, location and status. Imported from your shop drawing schedules.

02

Stage tracking

QR or barcode labels scanned at fabrication, dispatch, receipt and install. Works on any phone.

03

Drawing revision control

Shop drawings linked to panels, revisions logged and only current drawings released to the factory.

04

Digital elevations

Install progress marked on the façade from site, colour coded by status, with photos on every panel.

05

Delivery & laydown planner

Deliveries sequenced by elevation and level, booked against hoist and crane slots, with a live laydown map.

06

Receipt & damage checks

Deliveries checked off against the docket with damage photos and reorders raised on the spot.

07

Fabrication tracker

Your own shop or an outside fabricator sees what's released, what's due and what's been dispatched.

08

Progress claims

Claims calculated from installed panels and subframe by elevation, ready for Payapps or the builder's portal.

09

Variations & site instructions

Instructions captured on site with photos, priced, approved and carried through to the next claim.

10

QA & ITPs

Inspection and test plans, hold points and fixing checks on a phone, signed off against each drop.

11

Compliance pack

Product certificates, test reports and batch numbers attached to panels and bundled for the certifier.

12

Defect register

Defects pinned to panels on the elevation, assigned to crews and closed out with before and after photos.

13

Crews & access gear

Daily crew allocation, licence and ticket expiry alerts, EWP and swing stage logs and hire dates.

14

Site diary & reports

Daily diary from site with weather, crew, installs and delays. Weekly reports for the builder in one click.

03The systems

The big ones

Your whole façade job, on one system.

These are the systems cladding contractors need most. Each one works on its own and they get properly useful once they share the same panel data.

Panel tracking

Every panel, every stage, one scan.

Your shop drawing schedule becomes a live register of every panel on the job. Each one carries a label that gets scanned at fabrication, dispatch, receipt and install, so you can find any panel in seconds.

  • Panel schedules imported from shop drawing exports
  • Code, finish, size and location per panel
  • QR or barcode labels printed for the factory
  • Scan at fabrication, dispatch, receipt and install
  • Revision control with superseded drawings flagged
  • Only current revisions released to fabrication
  • Search any panel by code or location
  • Works offline on site and syncs later
  • Outside fabricators get their own login

Digital elevations

The highlighter elevation, finally retired.

Every elevation becomes a live drawing your supervisors mark up from their phone. Tap a panel to mark it installed, add a photo or flag an issue and the office sees it straight away.

  • Elevations colour coded by panel status
  • Mark installs from the deck or the EWP
  • Photos attached to each panel
  • Flag issues and missing panels on the spot
  • Progress by elevation, level and drop
  • Daily site diary with weather and crew
  • Delays and stand-down records
  • Weekly builder reports in one click

Deliveries & laydown

The right panels on the right truck.

Deliveries are planned against the install program so panels arrive in the order the crew will fix them. Receipts are checked off on a phone with damage photos and reorders raised before the day's out.

  • Deliveries sequenced by elevation and level
  • Hoist and crane slots booked against each load
  • Live laydown map by bay
  • Docket check-off on any phone
  • Damage photos logged at receipt
  • Reorders raised straight to the factory
  • Subframe, brackets and fixings tracked too
  • Low stock alerts for flashings and sealant

Claims & variations

Claims built from what's on the wall.

Progress claims come straight from installed panels and subframe, broken down the way the builder wants to see them. Variations from site get captured, priced and carried into the next claim so nothing slips through.

  • Claims from installed quantities
  • Breakdown by elevation, level and item
  • Photo evidence attached to each line
  • Ready for Payapps or the builder's portal
  • Site instructions captured with photos
  • Variations priced and sent for approval
  • Approved variations carried into claims
  • Invoices into Xero or MYOB
  • Retention and payment tracking

QA, defects & compliance

Handover without the paper chase.

ITPs and hold points get signed off on site against each drop. Defects get pinned to panels on the elevation and closed out with photos. Certificates and batch records sit against the panels they cover, so the compliance pack is ready when the certifier asks.

  • Digital ITPs and hold points
  • Fixing, sealant and flashing checks
  • Defects pinned to panel IDs
  • Builder defect lists imported and assigned
  • Before and after close-out photos
  • Product certificates and test reports stored
  • Batch numbers linked to panels
  • Handover pack exported in one go
  • Licence and ticket expiry alerts for crews
04How it changes

Before and after

A façade going up, wolloped.

Here's how a typical week on a façade job could change. Every contractor runs things differently, so we map yours first.

Before

  1. Ring the factory to find out where a panel is
  2. Panel cut to revision C, not D
  3. Truck arrives with the wrong level's panels
  4. Highlight the printed elevation at knock-off
  5. Count panels on a walk-around for the claim
  6. Hunt for certificates when the certifier asks

After

  1. Scan shows it on the truck, due at 10am
  2. Only the current revision gets released
  3. Loads sequenced to the install program
  4. Installs marked live from site with photos
  5. Claim built from panels actually installed
  6. Compliance pack already sitting against the job
05Services

Everything under one roof

Software, websites and systems for cladding contractors.

Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.

Custom software for cladding contractors

Built around how your cladding company actually runs: panel register, stage tracking and the admin in between, in one system you own.

Websites for cladding contractors

Fast, hand-built websites that rank for the searches your customers make and turn visits into enquiries, bookings or orders.

Cladding company system upgrades

Running on spreadsheets, old software or a platform you've outgrown? We move your data across and upgrade in stages so the business never stops.

Apps and portals for cladding contractors

Drawing revision control and digital elevations: customer and staff portals that work on any phone without an app store.

Integrations and automation

We connect Xero, MYOB and Procore so information moves on its own and nobody retypes it.

Hosting, support and care

Managed hosting, updates, backups and security for your cladding company, looked after by the people who built it.

06Integrations

Connections

Plays nicely with what you already use.

We connect to the tools you rely on, line up with the builder's platform and work alongside the drawing software your drafters already use.

  • Xero
  • MYOB
  • Procore
  • Aconex
  • Autodesk Construction Cloud
  • Payapps
  • AutoCAD
  • Revit
  • Bluebeam Revu
  • Microsoft 365
  • SharePoint
  • Google Workspace
  • Dropbox
  • Deputy
  • SafetyCulture
  • HammerTech
  • Employment Hero
  • Stripe
  • Twilio SMS
  • Google Maps
07How we work

The process

Some people dip their toe in. We turn up in a rebreather.

We get properly below the surface of your cladding company: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.

  1. 01

    Think

    We spend time in your office, at the factory and up on site, then work out where panels, drawings and paperwork are getting lost.

  2. 02

    Archi-tech

    We plan it before writing code: your panel schedules, stages, elevations, claims, QA, integrations, hosting and cost.

  3. 03

    Build

    Real engineering, shown to you early and often. Usually panel tracking first, so you get a win on your current job.

  4. 04

    Look after

    We host it, maintain it and keep improving it. When something breaks you call the people who built it.

08Questions

FAQ

Things cladding contractors ask us.

Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.

Can it work with our drawing and accounting software?

Usually, yes. We can pull panel schedules from your shop drawing exports out of AutoCAD, Revit or a spreadsheet and connect to Xero or MYOB for claims and invoicing.

The builder runs Procore or Aconex. Will this clash?

No. We line up with the builder's platform so drawings, RFIs and reports flow where they need to. Your system keeps the panel level detail the builder's platform was never built for.

Does it work on site with no signal?

Yes. Scanning and marking installs works offline on a phone and syncs once the crew is back in range.

Our panels come from an outside fabricator. Can they use it?

Yes. Fabricators get their own login to see released panels, update fabrication status and scan dispatches, without seeing the rest of your job.

Can the builder see progress without ringing us?

If you want them to. We can give the builder a read-only view of the elevations or send weekly reports automatically.

Do we have to switch from the platforms we already use?

No. If Payapps, Deputy or SafetyCulture is doing its job, we build around it. If something is holding you back we'll show you what replacing it would involve before anything changes.

How much does a system like this cost?

It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.

How long does it take?

Panel tracking or a defect register can be up and running quickly. Bigger systems are planned in stages so you get the first win early instead of waiting for everything at once.

Who looks after it once it's built?

We do. We host it on our own managed servers and keep it updated and secure. When you need something you ring the people who built it.

We already have systems. Can you upgrade them instead of starting again?

Usually, yes. We keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.

Contact

Got a cladding company problem? Consider it wolloped.

Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.

I've got