wollopit Got a problem? →

Commercial glazing software: schedules, orders & installs

Commercial glaziers: every window, one schedule. Measured, ordered, delivered and installed.

Window schedules live in spreadsheets. Glass orders get chased by phone and site measures are scribbled on drawings. Variations are agreed on a slab edge and forgotten by claim day. We build glazing schedules that track every window, door and panel from site measure to order, delivery and install, then we host them and look after them.

Looking for glazing schedule software for commercial jobs?

A commercial glazing job is hundreds of units, each with its own glass spec, frame system, size, finish and location on the building. Glass lead times are long and one wrong measure can hold up a whole level. Meanwhile the drawings keep getting revised, the builder's program keeps moving and the only person who knows where everything is happens to be on leave.

Wollopit builds custom software for commercial glaziers around how your jobs actually run. One live schedule drives the site measure, the factory, the glass orders, the deliveries and the install crews. Variations get captured when they happen and progress claims build themselves from what's actually in the wall. We connect the tools you already use, replace the spreadsheets holding you back and look after the lot on our own servers.

01The problems

What we hear from commercial glaziers

Does your commercial glazing company have these problems? Here's how we'd fix them.

Most glaziers we talk to are brilliant on the tools and run the office on spreadsheets, email chains and a whiteboard. It holds together until a level gets measured twice or a pallet of glass turns up for the wrong building.

  • The problemSchedules in spreadsheetsEvery window lives in a workbook with six versions floating around. It's out of date by Tuesday.
    How we fix itOne live glazing schedule shared by the office, the factory and site, with every change logged against the unit.
  • The problemSite measures get lostMeasures are pencilled on a drawing, photographed if you're lucky and keyed in days later.
    How we fix itMeasures entered on a tablet against each opening and checked against the design size, with tolerances flagged on the spot.
  • The problemDrawing revisions cause remakesA revised elevation changes three window sizes and the factory cuts to the old drawing anyway.
    How we fix itRevisions linked to the units they touch. Affected items get flagged and nothing goes to the factory on a superseded drawing.
  • The problemGlass orders chased by phoneYou ring the supplier every week to find out when the IGUs are landing.
    How we fix itGlass and frame orders tracked per unit with due dates, supplier confirmations pulled in and late alerts before the program slips.
  • The problemThe factory doesn't know what's nextFabrication runs in whatever order the paperwork arrived, not the order site needs it.
    How we fix itA factory board sequenced by level and install date, so the units going in next week get made first.
  • The problemDeliveries turn up in the wrong orderStillages arrive for level 6 while the crew is on level 2 and the crane slot is gone.
    How we fix itDelivery manifests built from the schedule, packed by drop and booked against crane and loading dock slots.
  • The problemInstall progress unclearThe builder asks which levels are closed in and you have to ring the leading hand.
    How we fix itInstalls ticked off by unit and level on the crew's phone, with photos and a live progress view for the office.
  • The problemBreakages and remakesCracked or wrong-size glass gets reordered from memory and nobody knows who's paying for it.
    How we fix itRemakes logged against the unit with a cause, reordered in a few taps and tracked until they're back in the wall.
  • The problemVariations agreed on site, never chargedThe site manager asks for a different glass type on a walk-through and it's never written down.
    How we fix itVariations raised on the phone on site, priced in the office, sent for approval and carried straight into the next claim.
  • The problemClaims hard to back upProgress claims don't match what the builder thinks is installed, so you argue about it every month.
    How we fix itClaims built from installed units and approved variations with photo evidence the QS can't argue with.
  • The problemDefects drag on for monthsThe builder's defects list arrives as a PDF and items bounce between crews for weeks.
    How we fix itDefects pinned to the unit and level, assigned to a crew and closed out with a photo.
  • The problemHandover paperwork scrambleGlass certificates, warranties and O&M manuals get hunted down the week before practical completion.
    How we fix itCertificates, test results and warranties stored against each unit as you go, with the handover pack generated in one click.
02What we build

Solutions

What we build for commercial glaziers. Usually all talking to each other.

Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.

01

Glazing schedule

Every window, door and panel with spec, frame system, size, finish, location and status in one live list.

02

Site measure app

Measures captured on a tablet against each opening, checked against design sizes and tolerances.

03

Drawing & revision register

Shop drawings and revisions linked to the units they affect, with superseded drawings locked out.

04

Glass & frame ordering

Orders raised from the schedule with due dates, supplier confirmations and late alerts.

05

Factory board

Fabrication sequenced by level and install date on a screen in the workshop.

06

Delivery & stillage tracking

Manifests by drop, stillage numbers, crane slot bookings and stillages tracked back to the yard.

07

Install tracking

Units signed off by level on the crew's phone, with photos and timestamps.

08

Remake register

Breakages and wrong sizes logged with a cause, reordered and tracked until they're installed.

09

Variations

Raised on site, priced in the office, approved by the builder and carried into the claim.

10

Progress claims

Monthly claims built from installed units and approved variations, ready for Xero or MYOB.

11

Defects & handover

Defects pinned to units, glass certificates and warranties stored as you go and handover packs in one click.

12

Crew & site compliance

Who's on which site, inductions, licences, SWMS and EWP tickets with expiry alerts.

13

Builder & client portal

Builders see progress, deliveries and defects without ringing your office.

03The systems

The big ones

Your whole glazing job, on one schedule.

These are the systems commercial glaziers ask us about most. Each one works on its own and they get properly useful once they're joined up.

Glazing schedule

Every unit on the building, in one live list.

The schedule becomes the single source of truth for the job. Every window, door and panel carries its spec, size, drawing revision and status, so the office, the factory and site are all looking at the same thing.

  • Units by building, level and elevation
  • Glass spec, frame system and finish
  • Design size and measured size side by side
  • Linked to the current drawing revision
  • Status from measure to installed
  • Change history on every unit
  • Import from your existing spreadsheet
  • Filter by level, type or status
  • Progress by level at a glance
  • Shared view for the builder

Site measure

Measure it once. Get it right first time.

Your measurer walks the floor with a tablet and enters sizes against each opening. Anything outside tolerance gets flagged before it reaches the factory, not after the glass is cut.

  • Openings listed by level and grid line
  • Width, height and diagonals
  • Tolerance checks against design size
  • Photos and notes on each opening
  • Works offline on site
  • Openings not ready flagged for remeasure
  • Sign-off by the measurer
  • Measures pushed straight to the schedule

Orders & deliveries

Know when the glass lands without ringing anyone.

Orders are raised straight from the schedule and tracked unit by unit. Supplier confirmations come in automatically and deliveries are packed in the order site needs them.

  • Glass and frame orders from the schedule
  • Supplier confirmations pulled from email
  • Due dates against the builder's program
  • Late alerts before the program slips
  • Factory board sequenced by install date
  • Delivery manifests by drop
  • Stillage numbers and returns
  • Crane and loading dock slots
  • Remakes reordered in a few taps

Install & defects

Installs and defects closed out from the floor.

Crews tick off each unit as it goes in, with a photo, from their phone. Defects from the builder land against the right unit and crew, then get closed with proof.

  • Install sign-off by unit and level
  • Photos and timestamps on every unit
  • Crew allocation by site and level
  • Defects pinned to units and levels
  • Close-out photos for every defect
  • Glass certificates stored per unit
  • Warranties and test results
  • Handover pack in one click

Variations & claims

Claims the builder can't argue with.

Variations are captured on site the moment they're asked for and priced in the office. Each month the claim builds itself from installed units and approved variations, backed by photos.

  • Variations raised on site by phone
  • Pricing and approval by the builder
  • Signed approvals stored on the job
  • Claims built from installed units
  • Approved variations added automatically
  • Photo evidence attached
  • Retention tracked per job
  • Invoices into Xero or MYOB
04How it changes

Before and after

A curtain wall going up, wolloped.

Here's how a month on a commercial job could change. Every glazing business runs a bit differently, so we map yours first.

Before

  1. Update the schedule spreadsheet and email it round
  2. Key in measures from photos of marked-up drawings
  3. Ring the supplier to find out when the glass lands
  4. Ring the leading hand to see what's installed
  5. Dig through texts for the variations agreed on site
  6. Argue the claim with the builder's QS

After

  1. The schedule updates itself from site and the factory
  2. Measures entered on the tablet against each opening
  3. Order status and due dates on screen
  4. Install progress by level, live with photos
  5. Variations already priced and approved
  6. Claim backed by install photos and signed variations
05Services

Everything under one roof

Software, websites and systems for commercial glaziers.

Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.

Custom software for commercial glaziers

Built around how your commercial glazing company actually runs: glazing schedule, site measure app and the admin in between, in one system you own.

Websites for commercial glaziers

Fast, hand-built websites that rank for the searches your customers make and turn visits into enquiries, bookings or orders.

Commercial glazing company system upgrades

Running on spreadsheets, old software or a platform you've outgrown? We move your data across and upgrade in stages so the business never stops.

Apps and portals for commercial glaziers

Drawing & revision register and glass & frame ordering: customer and staff portals that work on any phone without an app store.

Integrations and automation

We connect Xero, MYOB and Procore so information moves on its own and nobody retypes it.

Hosting, support and care

Managed hosting, updates, backups and security for your commercial glazing company, looked after by the people who built it.

06Integrations

Connections

Plays nicely with what you already use.

We connect to the tools you rely on, work alongside the builder's platforms and replace the spreadsheets that are holding you back.

  • Xero
  • MYOB
  • Procore
  • Aconex
  • Payapps
  • HammerTech
  • SafetyCulture
  • Bluebeam
  • AutoCAD
  • LogiKal
  • Microsoft 365
  • Google Workspace
  • Dropbox
  • Deputy
  • Employment Hero
  • Stripe
  • Twilio SMS
  • Google Maps
07How we work

The process

Some people dip their toe in. We turn up in a rebreather.

We get properly below the surface of your commercial glazing company: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.

  1. 01

    Think

    We spend time in the office, the factory and on site, then work out where your schedule, orders and claims are actually falling over.

  2. 02

    Archi-tech

    We plan it before writing code: your units, specs, suppliers, crews, builders, claims, hosting and cost.

  3. 03

    Build

    Real engineering, shown to you early and often. Usually the schedule and site measure first, so your next job starts on the new system.

  4. 04

    Look after

    We host it, maintain it and keep improving it. When something breaks you call the people who built it.

08Questions

FAQ

Things commercial glaziers ask us.

Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.

Can we import our existing window schedules?

Yes. We bring in your current spreadsheets so live jobs move across without retyping hundreds of units.

Can it connect to our accounting and glass supplier systems?

Usually, yes. We connect to Xero or MYOB for invoicing and claims. Where your glass supplier sends order confirmations by email or file we can pull them into the schedule automatically.

Does it work on site without reception?

Yes. The site measure and install apps work offline on a tablet or phone and sync when the crew gets signal again.

Can builders see progress without ringing us?

Yes. We can give builders a login to see install progress, deliveries and defects for their job only.

Do we have to stop using Procore, Aconex or Payapps?

No. Those usually belong to the builder and we build around them. Your schedule and claims can sit alongside them and we can push or pull information where it saves you double handling.

We use LogiKal or other estimating software. Do we have to switch?

No. We build around what works. If your estimating or fabrication software is doing its job we take the outputs and run the job from there.

How much does it cost?

It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.

How long does it take?

We plan it in stages so you get the first win early, usually the live schedule and site measures. Orders, installs and claims follow without waiting for everything at once.

Who looks after it once it's built?

We do. We host it on our own managed servers and keep it updated and secure. When you need something you ring the people who built it.

We already have systems. Can you upgrade them instead of starting again?

Usually, yes. We keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.

Contact

Got a commercial glazing company problem? Consider it wolloped.

Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.

I've got