wollopit Got a problem? →

Post-tensioning software: stressing records & certificates

Post-tensioners: stressing records the engineer can actually read. Every tendon stressed, checked and certified.

Elongations scribbled on a clipboard, calcs checked back at the office and the builder ringing because the props can't come out until the certificate lands. We build stressing record systems for post-tensioning contractors that capture every tendon at the jack, check it against the design and issue the certificate on the spot. Then we host it and look after it.

Looking for post-tensioning software that handles stressing records and certificates?

Every PT slab comes with a tendon schedule, calculated elongations, gauge pressures and tolerances to hit. Then there's transfer strength to confirm before you stress, jacks that need current calibrations and grouting to record before handover. Most post-tensioning companies run all of that on paper logs, marked-up drawings, a spreadsheet of formulas only one person trusts and a phone full of photos. Meanwhile the builder can't strip props or start the next pour until the engineer has the records.

Wollopit builds custom post-tensioning software around how your crews actually work. Tendon schedules load straight from your design data. Crews enter pressures and elongations at the jack on a tablet, variances flag before the jack comes off and the stressing certificate goes out the moment the last tendon is done. Equipment, grouting, level schedules and claims all hang off the same job. We connect the tools you already use, replace the ones holding you back and look after the lot on our own servers.

01The problems

What we hear from post-tensioning contractors

Does your post-tensioning company have these problems? Here's how we'd fix them.

Most PT contractors we talk to are spot on with the steel and the jack. It's the paperwork afterwards that holds up the pour cycle.

  • The problemClipboard stressing logsPressures and elongations are handwritten at the jack in the wind, then typed up at night by whoever can read the handwriting.
    How we fix itStressing data entered tendon by tendon on a tablet at the jack, with photos and the operator's name stamped on every record.
  • The problemTolerances checked too lateAn out-of-tolerance tendon gets spotted back at the office after the crew has packed up and moved to the next site.
    How we fix itCalculated elongations loaded up front so variances flag on the spot, while the jack is still on and a re-stress is easy.
  • The problemCertificates hold up the propsThe builder can't strip props or load the slab until the engineer has the records. The certificate sits in someone's drafts for days.
    How we fix itBranded stressing certificates generated from site data as soon as the last tendon is stressed, sent straight to the builder and engineer.
  • The problemTendon schedules retyped by handTendon IDs, lengths and calculated elongations get copied from the design spreadsheet into another spreadsheet, typos and all.
    How we fix itImport the tendon schedule from your design spreadsheets once and every stressing log, cut list and certificate uses the same numbers.
  • The problemWaiting on transfer strengthCrews turn up to stress and nobody's sure if the cylinder results are back or if the concrete has hit transfer strength yet.
    How we fix itConcrete test results logged against each pour, with a clear 'ready to stress' flag before anyone gets in the ute.
  • The problemCalibrations tracked looselyJack and gauge calibration certificates live in a folder somewhere and nobody notices one has expired until an engineer asks.
    How we fix itEvery jack, pump and gauge linked to its calibration certificate, with expiry alerts and the right cert attached to each stressing record.
  • The problemGrouting barely recordedBonded tendons get grouted but the batch, pressure and who signed it off are thin or missing at handover.
    How we fix itGrouting dates, mix batches, pressures and sign-offs recorded per duct, ready to drop into the handover pack.
  • The problemMarked-up drawings in the uteProgress is shown by highlighter on a crumpled drawing. One wet day and you've lost which tendons were done.
    How we fix itA live tendon layout per level showing installed, stressed and grouted, so anyone can see progress from the office.
  • The problemPour cycle chaosInstall, inspection, pour, stressing and grouting dates shift with every slab and the builder's program changes weekly.
    How we fix itA level-by-level schedule that crews, the office and the builder can all see, updated the moment a pour moves.
  • The problemStrand and anchors go walkaboutCoils, anchors, ducts and pockets get over-ordered on one job and short on the next.
    How we fix itMaterials planned from the tendon schedule, with cut lists, deliveries and site stock tracked per job.
  • The problemSafety paperwork everywhereSWMS, prestarts, exclusion zones and tickets for high-pressure hydraulics are on paper or lost in emails.
    How we fix itPrestarts, SWMS sign-ons and crew tickets on phones, with expiry alerts before anyone's ticket lapses.
  • The problemClaims chasing the programProgress claims, standing time and extra trips for re-stressing get missed because nobody wrote them down.
    How we fix itClaims built per level from completed work, variations logged on site with photos and invoices pushed to Xero or MYOB.
02What we build

Solutions

What we build for post-tensioning contractors. Usually all talking to each other.

Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.

01

Stressing app

Pressures and elongations captured tendon by tendon at the jack, working offline in basements and dead zones.

02

Variance checks

Design elongations loaded with tolerance bands so out-of-range tendons flag before the jack comes off.

03

Stressing certificates

Branded certificates issued straight from site data with calibration certs and photos attached.

04

Tendon schedule import

Tendon IDs, lengths, profiles and calculated elongations pulled in from your design spreadsheets.

05

Transfer strength tracker

Cylinder results logged per pour with a clear ready-to-stress status for the crew.

06

Equipment register

Jacks, pumps and gauges with serial numbers, calibration dates and expiry alerts.

07

Grouting records

Grout batches, pressures, vents and sign-offs logged per duct for bonded systems.

08

Live tendon layout

Each level's tendon plan showing installed, stressed and grouted in colour.

09

Level scheduling

Install, pour, stressing and grouting planned per floor on one shared board.

10

Materials & cut lists

Strand, anchors, ducts and chairs planned from the schedule and tracked per job.

11

Engineer & builder portal

A login where the engineer and builder see records, certificates and progress for their job.

12

Crew safety & prestarts

SWMS sign-ons, prestarts, exclusion zone checks and ticket expiries on phones.

13

Claims & variations

Progress claims per level, re-stress callouts and standing time logged with photos and sent to Xero or MYOB.

03The systems

The big ones

Every tendon, on one system.

These are the systems post-tensioning contractors ask us about most. Each works on its own and they get properly useful once they're joined up.

Stressing records

Every tendon recorded at the jack.

Crews pick the level, pick the tendon and enter gauge pressure and elongation as they stress. The app checks each reading against the calculated elongation straight away, so a variance gets sorted while the jack is still on.

  • Tendon schedule loaded per level
  • Pressure and elongation per stage
  • Live variance against design
  • Tolerance flags before the jack comes off
  • Re-stress and lift-off records
  • Photos and notes per tendon
  • Jack and gauge picked from the register
  • Works offline in basements
  • Operator and time stamped
  • Syncs the moment it gets signal

Certificates & portal

The certificate goes out before the crew leaves site.

When the last tendon on a pour is stressed, a branded stressing certificate is built from the site data with calibration certs attached. The engineer and builder get it straight away and can log in to see every record behind it.

  • Certificates generated from site data
  • Your branding and engineer's format
  • Calibration certs attached automatically
  • Variances and re-stresses noted
  • Sent to builder and engineer on completion
  • Engineer sign-off online
  • Builder and engineer logins
  • Full history per job and level
  • Handover pack in one download
  • Nothing retyped back at the office

Equipment & calibration

No more expired jack certs in a folder.

Every jack, pump and gauge gets its own record with serial number, calibration certificate and due date. The right calibration attaches itself to each stressing record and you get a heads up well before anything expires.

  • Jacks, pumps and gauges registered
  • Calibration certs stored per item
  • Expiry alerts by email and SMS
  • Equipment booked to jobs and crews
  • Blocked from use once expired
  • Service and repair history
  • QR tags on every jack
  • Where each kit is right now

Pour cycle scheduling

Every level, every stage, one board.

Install, inspection, pour, transfer strength, stressing and grouting laid out level by level. When the builder moves a pour, the crews and the office see it straight away and the ready-to-stress flag tells everyone when it's go time.

  • Level-by-level stage board
  • Pour dates synced from the builder
  • Cylinder results per pour
  • Ready-to-stress status
  • Crews allocated per job
  • SMS updates to crews
  • Live tendon layout per level
  • Grouting scheduled behind stressing
  • Builder view without the phone calls

Grouting & claims

Grouted, recorded and claimed.

Grouting is logged per duct with batch, pressure and sign-off so the handover pack is complete. Completed work rolls into progress claims per level and re-stress callouts or standing time are captured on site before they're forgotten.

  • Grout batches and pressures per duct
  • Vent and sign-off records
  • Handover pack per job
  • Progress claims per level
  • Variations with photos on site
  • Standing time and extra trips logged
  • Invoices into Xero or MYOB
  • Materials used against each job
04How it changes

Before and after

A stressing day, wolloped.

Here's how a stressing day could change. Every PT outfit runs a bit differently, so we map yours first.

Before

  1. Ring around to find out if the cylinder results are back
  2. Elongations written on a clipboard at the jack
  3. Calcs checked against the spreadsheet back at the office
  4. Dig through a folder for the jack calibration cert
  5. Certificate typed up and sent days later
  6. Builder waits to strip props and rings twice a day

After

  1. Ready-to-stress flag shows transfer strength is reached
  2. Elongations entered on a tablet at the jack
  3. Variances flagged on the spot while the jack is still on
  4. Calibration cert attached automatically
  5. Certificate issued the same afternoon
  6. Builder and engineer get the records straight away
05Services

Everything under one roof

Software, websites and systems for post-tensioning contractors.

Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.

Custom software for post-tensioning contractors

Built around how your post-tensioning company actually runs: stressing app, variance checks and the admin in between, in one system you own.

Websites for post-tensioning contractors

Fast, hand-built websites that rank for the searches your customers make and turn visits into enquiries, bookings or orders.

Post-tensioning company system upgrades

Running on spreadsheets, old software or a platform you've outgrown? We move your data across and upgrade in stages so the business never stops.

Apps and portals for post-tensioning contractors

Stressing certificates and tendon schedule import: customer and staff portals that work on any phone without an app store.

Integrations and automation

We connect Xero, MYOB and Procore so information moves on its own and nobody retypes it.

Hosting, support and care

Managed hosting, updates, backups and security for your post-tensioning company, looked after by the people who built it.

06Integrations

Connections

Plays nicely with what you already use.

We connect to the tools you rely on, work alongside the builder's platforms and replace the spreadsheets holding you back.

  • Xero
  • MYOB
  • Procore
  • Aconex
  • Autodesk Construction Cloud
  • Bluebeam
  • Microsoft 365
  • Excel
  • SharePoint
  • Google Workspace
  • Dropbox
  • Payapps
  • Assignar
  • HammerTech
  • SafetyCulture
  • Deputy
  • Employment Hero
  • Stripe
  • Twilio SMS
  • Google Maps
07How we work

The process

Some people dip their toe in. We turn up in a rebreather.

We get properly below the surface of your post-tensioning company: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.

  1. 01

    Think

    We go out on a stressing day, sit with whoever types up the certificates and work out what's actually holding up your pour cycle.

  2. 02

    Archi-tech

    We plan it before writing code: your tendon data, tolerances, certificate format, equipment, builders, hosting and cost.

  3. 03

    Build

    Real engineering, shown to you early and often. Usually the stressing app and certificates first, so you get a win on your next slab.

  4. 04

    Look after

    We host it, maintain it and keep improving it. When something breaks you call the people who built it.

08Questions

FAQ

Things post-tensioning contractors ask us.

Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.

Can it work with the design data and software we already use?

Usually, yes. We can import tendon schedules and calculated elongations from your design spreadsheets so nothing's retyped. We also connect to Xero or MYOB for invoicing.

Will it work in a basement with no signal?

Yes. The stressing app works offline and syncs as soon as the tablet gets signal again, so a car park level or a dead zone doesn't stop the crew.

Can the certificate match our engineer's format?

Yes. We build the certificate around the format your engineers expect, in your branding, with calibration certs and variance notes included.

Does it handle bonded and unbonded systems?

Yes. We set it up for the way you work, whether that's unbonded slabs, bonded tendons with grouting, band beams or transfer slabs.

Can the builder and engineer log in?

Yes, if you want them to. They can see progress, records and certificates for their own jobs and nothing else.

Do we have to switch from the platforms we already use?

No. If Procore, Aconex or your accounting software is doing its job, we build around it. If something is holding you back, we'll show you what replacing it would involve before anything changes.

How much does post-tensioning software cost?

It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.

How long does it take?

We plan it in stages. Something like the stressing app and certificates can come first, so you get the first win early instead of waiting for the whole system.

Who looks after it once it's built?

We do. We host it on our own managed servers and keep it updated, backed up and secure. When you need something you ring the people who built it.

We already have systems. Can you upgrade them instead of starting again?

Usually, yes. We keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.

Contact

Got a post-tensioning company problem? Consider it wolloped.

Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.

I've got