wollopit Got a problem? →

Rope access software, job management & app

Rope access: the paperwork sorted before anyone goes over the edge. Rig more, chase less.

Rescue plans copied from the last job with the old address still in them, tickets expiring without anyone noticing and permits chased at the gate on the morning of the drop. We build job management for rope access companies that has the crew, the plan and the paperwork ready before anyone rigs, then we host it and look after it.

Looking for rope access software that handles jobs, rescue plans and tickets?

Every rope access job needs the right mix of IRATA or ARAA levels, a rescue plan written for that building, a SWMS for the work at height and the client's permits signed off. Then there's the anchor certs, the gear inspections, the inductions and the weather. Most teams pull it all together from email, shared folders, a group chat and the supervisor's memory.

Wollopit builds rope access software around how your company actually runs. One system that won't let a job go live until the crew is qualified, the rescue plan is signed and the permits are in. Techs log drops and rope hours on their phones. Clients get clean inspection reports with photos on the elevation. We connect to Xero, MYOB and the tools you already use, then host and look after the lot.

01The problems

What we hear from rope access technicians

Does your rope access company have these problems? Here's how we'd fix them.

Most rope access outfits we talk to have brilliant techs and serious safety standards. The paperwork behind it lives in six places and only holds together because the supervisor stays up late.

  • The problemRescue plans recycledPlans get copied from the last site with the old address, the wrong anchors and someone else's rescue kit still in them.
    How we fix itRescue plans built per job from templates, with site photos, anchors and the rescue method signed by the Level 3.
  • The problemTickets expire unnoticedA tech's IRATA level, first aid or white card lapses and nobody spots it until the client's induction desk does.
    How we fix itEvery ticket tracked per tech with expiry alerts weeks ahead and a block on crewing anyone who's lapsed.
  • The problemWrong crew mixA job gets crewed without a Level 3 on site or with two Level 1s and nobody to supervise them.
    How we fix itCrewing that checks levels, tickets and site inductions before the team is confirmed.
  • The problemPermits chased on the dayWork at height permits, roof access and hot work sorted at the gate while the crew stands around on the clock.
    How we fix itPermit and access requests sent to the client and building manager well ahead, with status on every job card.
  • The problemSWMS nobody readsThe same generic SWMS gets printed for every job and signed at the pre-start without anyone reading it.
    How we fix itJob-specific SWMS pulled from your library, signed on phones by every tech with a record of who signed what.
  • The problemGear inspections on paperRope and harness checks live in a notebook in the ute and nobody knows which rope is due for retirement.
    How we fix itA gear register with QR tags, six-monthly inspection reminders, issue to tech and retirement alerts.
  • The problemAnchor certs out of dateThe building's anchors were last certified who knows when and the cert is buried in a strata email.
    How we fix itAnchor records per building with test dates, cert PDFs and a check before any job is booked on them.
  • The problemRope hours not loggedTechs forget to record hours for their logbooks and try to piece it together before their next assessment.
    How we fix itRope hours and tasks captured per job and exported in a format ready for their logbook.
  • The problemProgress measured in guessesThe client asks how many drops are done and the office has to ring the supervisor on the rope.
    How we fix itDrop-by-drop progress logged from site with photos, so the office and the client see it live.
  • The problemInspection reports take a weekFaçade inspections come back as hundreds of phone photos that someone has to sort, label and turn into a Word report.
    How we fix itDefects logged on the rope against the drop and elevation, with the report built as you go.
  • The problemWeather calls by gut feelWind picks up mid-morning, the crew sits on the roof and nobody recorded why the job stopped.
    How we fix itWind and weather checks logged at pre-start and on stand-downs, with reschedules sent to the client.
  • The problemInvoices lag behind the workVariations agreed on the roof never make it to the invoice and the job gets billed weeks late.
    How we fix itVariations captured on site with client sign-off and invoices pushed to Xero or MYOB when the job closes.
02What we build

Solutions

What we build for rope access technicians. Usually all talking to each other.

Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.

01

Job cards

Scope, site, building access, crew, rescue plan and permits on one card that won't go live until it's complete.

02

Quoting by drop

Quotes built from drops, elevations and access method, then turned into a job with one tap.

03

Rescue plans

Site-specific plans from templates with anchors, rescue kit, method and photos, signed by the supervisor.

04

SWMS & pre-starts

Job-specific SWMS and daily pre-starts signed on phones, with weather and wind checks recorded.

05

Ticket tracking

IRATA and ARAA levels, first aid, white cards, EWP and site inductions with expiry alerts.

06

Crewing checks

Teams checked for the right levels and inductions before anyone is booked.

07

Permit tracking

Permit to work, roof access and hot work requests sent early and tracked to approval.

08

Gear registers

Ropes, harnesses, descenders and ascenders tagged, inspected and retired on time.

09

Anchor records

Anchors and certification dates per building, with cert PDFs and re-test reminders.

10

Rope hours & logbooks

Hours and tasks logged per tech for their logbooks and next assessment.

11

Drop tracking

Progress by drop and elevation from site, with photos the client can see.

12

Inspection & defect reports

Defects pinned to the elevation with photos and notes, turned into a branded report.

13

Client portal

Building managers see job status, permits, progress photos and reports without ringing.

14

Invoicing & variations

Variations signed on site and invoices sent to Xero or MYOB when the job closes.

15

A website that climbs

Hand-built, quick on mobile and built to rank for 'rope access' plus your city.

03The systems

The big ones

Your whole rope access company, on one system.

These are the systems rope access companies ask us about most. Each one works on its own and they get properly clever when they're joined up.

Job management

No job goes live until it's all in place.

Every job gets one card: scope, building, access, crew, rescue plan, SWMS, permits and anchor certs. Anything missing shows red and the job can't be marked ready until it's sorted. The supervisor sees the whole pack on their phone at the pre-start.

  • One job card per site and scope
  • Readiness checklist that blocks go-live
  • Crew, gear and paperwork in one place
  • Building access and contact details
  • Site photos and roof plans attached
  • Calendar by crew and by building
  • Recurring jobs like window cleans
  • Job pack on every tech's phone

Tickets & crewing

The right levels on every rope, every time.

Every tech's IRATA or ARAA level, first aid, white card and site inductions in one place with expiry dates. Build a crew and it checks there's a Level 3 on site and everyone's current before you can confirm it.

  • IRATA and ARAA levels per tech
  • First aid, CPR and white card
  • Client and site inductions
  • Expiry alerts weeks ahead
  • Level 3 supervisor check on every crew
  • Lapsed tickets blocked from crewing
  • Ticket copies stored and shareable
  • Crew notifications by SMS
  • Availability and leave

Rescue plans & SWMS

A rescue plan written for this building, not the last one.

Rescue plans built per job from your templates, with the anchors, rescue kit, method and photos for that site. SWMS and pre-starts are signed on phones so you know exactly who read what and when.

  • Rescue plan templates by access type
  • Site photos and anchor locations
  • Rescue kit checklist per job
  • Supervisor sign-off before go-live
  • Job-specific SWMS from your library
  • Digital signatures from every tech
  • Daily pre-starts with wind checks
  • Stand-downs and incidents logged
  • Version history for audits

Gear & anchors

Every rope tagged. Every anchor current.

Ropes, harnesses, descenders and ascenders carry a QR tag with their inspection history and who has them. Building anchors sit in the same system with their certification dates, so nobody rigs off an anchor that's out of date.

  • QR tags on every item
  • Inspection schedule and reminders
  • Pre-use checks on the phone
  • Issue and return by tech
  • Retirement alerts and records
  • Quarantine for damaged gear
  • Anchor register per building
  • Cert PDFs and re-test reminders

Drops & reports

Progress by drop. Reports done by the time you de-rig.

Techs log each drop and every defect from site with photos pinned to the elevation. The office and the client see progress live and inspection reports build themselves as the job goes, ready to send the day you finish.

  • Drops tracked by elevation
  • Photos pinned to the drop
  • Defect logging with severity
  • Branded inspection reports
  • Before and after photos
  • Rope hours captured per tech
  • Variations signed on site
  • Client portal for building managers
  • Invoices to Xero or MYOB
04How it changes

Before and after

A rope job, wolloped.

Here's how the week before a job could change. Every rope access company runs differently, so we map yours first.

Before

  1. Rescue plan copied from the last job with the old address
  2. A tech's ticket expired last month
  3. No Level 3 confirmed until the night before
  4. Permit chased at the gate while the crew waits
  5. Rope inspection dates in a notebook in the ute
  6. Rope hours guessed weeks later

After

  1. Rescue plan written for this building and signed
  2. Expiry flagged weeks ahead and renewed
  3. Crew checked for levels before it's confirmed
  4. Permit approved days before the job
  5. Every rope scanned and in date
  6. Hours logged on the job, ready for logbooks
05Services

Everything under one roof

Rope access software and a rope access app built for your crews.

Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.

Rope access job management software

Every job in one place with its site details, permits, rescue plan, SWMS, crew and drops. Supervisors see which jobs are ready to go and which are waiting on a permit or a ticket. Nothing heads to site until the paperwork that keeps your crew safe is actually done.

Rope access quoting software

Quote by drop, elevation or building face with your own rates for access setup, rigging and the work itself. Add mobilisation, equipment and travel in a few clicks. Accepted quotes turn straight into jobs so the crew sheet and drop list already exist when the client says yes.

Rescue plan software

Build rescue plans from templates matched to the job type and site. Each plan is attached to the job, signed by the crew at the pre-start and stored with the job record. When a client or principal contractor asks for evidence you can send it in minutes.

Rope access app

Techs use the app on site with gloves on and a phone in a chest pocket. Pre-starts, drop progress, photos and defect notes go in with big buttons and minimal typing. It keeps working without signal and syncs once they are back on the ground or near the van.

Anchor inspection software

Every anchor recorded with its location, type, install date, test results and photos. Recertification dates trigger reminders well before they lapse. Building managers get a clean report they can file and your techs know which anchors are current before they rig off them.

Rope access website design

A rope access website that shows the work you do, the buildings and structures you access and the tickets your team holds. Facility managers and builders find you on Google, see you take safety seriously and send a quote request with the details you need to price it.

06Buying guide

Worth knowing

Choosing rope access software: off-the-shelf or built for you?

Good rope access software should start with safety and work outwards. Look for ticket tracking that checks IRATA and ARAA levels against each job, rescue plans and SWMS attached to the work, permits that block a job until they are approved and a gear register with inspection dates. On top of that you want quoting by drop, progress tracking and inspection reports clients can actually read.

Off-the-shelf tools handle a lot of this. ServiceM8 is a solid job management tool for trades, SafetyCulture does inspections and checklists well and Assignar covers crews and plant. Where they tend to fall short is the rope-specific detail. Crewing checks by ticket level, drop-by-drop progress and anchor records usually end up in spreadsheets sitting next to the main tool.

A custom or connected system changes the morning before a job. The supervisor sees a crew that meets the ticket requirements, a rescue plan already attached and gear that is in date. Techs log drops from the rope access app and the client sees progress without ringing. Invoices and variations come from the same records so nothing slips between site and office.

Start with the problem that worries you most, usually lapsed tickets or missing paperwork. Fix that first and keep the tools that already work, whether that is Xero, ServiceM8 or SafetyCulture. Then add rope access quoting software, anchor inspection software or a client portal in stages. Each piece should prove its worth on real jobs before the next one goes in.

07Integrations

Connections

Plays nicely with what you already use.

We connect to the tools you rely on, work alongside the job and safety platforms you're happy with or replace the ones holding you back.

  • Xero
  • MYOB
  • ServiceM8
  • Assignar
  • SafetyCulture
  • Procore
  • HammerTech
  • Rapid Global
  • Cm3
  • Microsoft 365
  • Google Workspace
  • Dropbox
  • Deputy
  • Employment Hero
  • Stripe
  • Twilio SMS
  • Google Maps
  • DocuSign
08How we work

The process

Some people dip their toe in. We turn up in a rebreather.

We get properly below the surface of your rope access company: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.

  1. 01

    Think

    We spend time in the office, the gear room and on site at a pre-start, then work out where jobs actually get held up.

  2. 02

    Archi-tech

    We plan it before writing code: your jobs, crews, tickets, rescue plans, gear, client permits, hosting and cost.

  3. 03

    Build

    Real engineering, shown to you early and often. Usually the most painful bit first, so your next job starts with its paperwork sorted.

  4. 04

    Look after

    We host it, maintain it and keep improving it. When something breaks you call the people who built it.

09Questions

FAQ

Things rope access technicians ask us.

Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.

Can it stop a job going ahead if a ticket has lapsed?

Yes. That's the point of it. A job card won't show as ready until every tech on it is current, there's a Level 3 on the crew and the rescue plan and permits are signed off. You choose which checks are hard stops and which are just warnings.

Does it handle both IRATA and ARAA?

Yes. We track whichever scheme your techs hold along with first aid, white cards and client inductions. Rope hours can be exported so techs keep their logbooks up to date for their next assessment.

Can our techs use it on the rope?

Yes. It works on phones with big buttons for gloved hands. Drops, photos and defects can be logged on site and sync once there's signal again.

Can clients see progress and reports?

Yes. Building managers and head contractors can log in to see job status, permits, progress by drop and the finished inspection report. They stop ringing the office for updates.

Can it work with the tools we already use?

Usually, yes. We connect to Xero or MYOB for invoicing and can sit alongside SafetyCulture, Assignar or ServiceM8 if they're doing their job. Client permits that arrive as PDFs or emails get pulled onto the job card.

Do we have to switch platforms?

No. We build around what already works. If a platform is holding you back we'll show you what replacing it would involve before anything changes.

How much does rope access software cost?

It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.

How long does it take?

Smaller jobs like ticket tracking or a gear register can be quick. Bigger systems are planned in stages so you get the first win early instead of waiting for everything at once.

Who looks after it once it's built?

We do. We host it on our own managed servers and keep it updated and secure. When you need something you ring the people who built it.

Is this an alternative to ServiceM8 or Assignar?

It can be, but it does not have to be. ServiceM8 and Assignar are good tools and we can connect to them and add the rope access detail they lack. If one is genuinely holding your team back we can build a replacement instead.

Can you build an IRATA logbook app?

We can build a rope access app that records rope hours, tasks and supervisor details as your techs work. It makes filling in the official IRATA or ARAA logbook quick and accurate. It sits alongside the official logbook rather than replacing it.

Do you build rope access websites too?

Yes. We build rope access websites that show the work you do, the tickets you hold and the safety systems behind them. Quote requests can feed straight into your quoting software so the details arrive ready to price.

Do you work with rope access companies outside Brisbane?

Yes. We work with rope access companies Australia-wide. Most of our work happens remotely through video calls and screen sharing. In South East Queensland we can visit your yard or site when that helps.

We already have systems. Can you upgrade them instead of starting again?

Usually, yes. We keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.

Contact

Got a rope access company problem? Consider it wolloped.

Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.

I've got