Road construction software: lots, tests & quantities

Road builders: lots, tests and quantities that add up. Close out lots, not arguments.

The lot register lives in the site engineer's spreadsheet, compaction results turn up as PDFs in someone's inbox and quantities get argued over every claim. We build lot, test and quantity tracking systems for road builders that close out every lot with the evidence attached. Then we host them and look after them.

Looking for lot register and test tracking software for road jobs?

Road jobs for councils and state road authorities run on lots, ITPs, hold points and test results. Every layer on every chainage needs a conformance trail before it gets paid. Most road builders hold that trail together with a lot spreadsheet, a shared drive full of lab PDFs, carbon-copy dockets in the ute and a site engineer who stays back every night. Miss one density result and a claim can sit for weeks.

Wollopit builds custom road construction software around how your jobs actually run. Every lot is linked to its ITP, tests, quantities, dockets and sign-offs. Hold points get released from site. Lab results land on the right lot and fails go straight to the right people. Claims build themselves from closed lots. We connect the survey, plant and accounting tools you already use and look after the whole thing on our own servers.

01The problems

What we hear from road builders

Does your road construction company have these problems? Here's how we'd fix them.

Most road builders we talk to can lay a beautiful pavement. The pain starts when the principal wants the paperwork to prove it.

  • The problemLot registers in spreadsheetsLots live in a workbook the engineer updates when they get a spare hour. Nobody else trusts which version is current.
    How we fix itA live lot register by chainage, layer and status that everyone on the job sees the same way.
  • The problemTest results lost in emailDensity, CBR and core results arrive from the lab as PDFs and get filed somewhere. A failed test gets noticed after the next layer is down.
    How we fix itTest results attached to the right lot the day they arrive, with fails flagged to the engineer and foreman straight away.
  • The problemHold points slow the jobThe crew and a roller sit idle while someone chases the superintendent for a release.
    How we fix itHold point releases requested from site with the evidence attached and signed off on a phone.
  • The problemITPs on paperInspection and test plans printed, ticked in the cab and lost in a folder that gets rained on.
    How we fix itDigital ITPs set up against your spec, ticked on site with photos and tied back to each lot.
  • The problemQuantities don't matchTonnes, cubes and square metres are pieced together from weighbridge dockets, survey files and the foreman's notebook.
    How we fix itQuantities captured against each lot from dockets and survey data, with a running total against the design.
  • The problemDockets in the uteQuarry, asphalt and water cart dockets ride around in the glovebox until someone collects them at month end.
    How we fix itDockets photographed or imported on arrival, matched to the truck, the material and the lot.
  • The problemClaims disputedThe principal pushes back on quantities and nobody can find the evidence fast enough.
    How we fix itProgress claims built from closed lots with tests, quantities and releases attached to every line.
  • The problemDaily diaries patchyWeather, plant, labour and delays get written up late, if at all. Then you need them for an extension of time claim.
    How we fix itDaily diaries filled in on site with photos, plant hours and delays logged as they happen.
  • The problemNCRs that never closeNonconformances get raised, emailed around and forgotten until the audit.
    How we fix itAn NCR register with owners, actions, due dates and the lot held until it's closed out.
  • The problemPlant hours guessedMachine hours come from memory on a Friday and dayworks go unbilled.
    How we fix itPlant hours and pre-starts logged by operators on their phones, with dayworks flagged for the claim.
  • The problemVariations argued after the factExtra work gets done on a verbal okay and turns into a fight three months later.
    How we fix itVariations recorded on site with photos, quantities and approval tracked before they hit the claim.
02What we build

Solutions

What we build for road builders. Usually all talking to each other.

Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.

01

Lot register

Lots by chainage, layer, work type and status, with a map view of the job.

02

ITP manager

Inspection and test plan templates by spec, ticked off on site against each lot.

03

Test tracking

Lab results linked to lots, compared to spec limits with fail alerts.

04

Hold & witness points

Releases requested from site and signed off by the superintendent on a phone.

05

Quantity tracking

Tonnes, cubes, square metres and lineal metres per lot against design quantities.

06

Docket capture

Quarry, asphalt and cartage dockets matched to trucks, materials and lots.

07

Progress claims

Claims built from closed lots with the evidence attached to every line.

08

Variations & dayworks

Extra work recorded with photos, quantities and approvals before it's claimed.

09

Site diaries

Weather, labour, plant, deliveries and delays logged daily with photos.

10

NCR register

Nonconformances raised, assigned and closed out with lots held until they are.

11

Plant & pre-starts

Operator pre-starts, machine hours and defects logged from the cab.

12

Principal portal

A login for the client or superintendent to see lots, tests and releases.

13

Lot closeout packs

Conformance packs for each lot generated as a single PDF when it closes.

03The systems

The big ones

Your whole road job, on one system.

These are the systems road builders ask us about most. Each one works on its own. They get properly useful once they're joined up.

Lot register & ITPs

Every lot, every layer, every chainage. Live.

Your lot register stops being a spreadsheet and becomes the backbone of the job. Each lot carries its ITP, inspections, hold points and status so anyone can see what's open, what's waiting and what's ready to close.

  • Lots by chainage, layer and work type
  • Map view of the job by status
  • ITP templates set up against your spec
  • Inspections ticked on site with photos
  • Hold and witness point requests
  • Superintendent sign-off on a phone
  • Next layer blocked until release
  • Works in poor reception and syncs later
  • Lot closeout pack in one PDF

Test tracking

Lab results on the right lot, the day they land.

Lab reports sent to a job address get attached to the right lot and checked against spec limits. A fail goes straight to the engineer and foreman before the next layer goes down.

  • Density, CBR, moisture and core results
  • Results matched to lot and location
  • Checked against spec limits
  • Fail alerts by SMS and email
  • Retest requests tracked to closure
  • Test frequency checked against the ITP
  • Lab report PDFs kept with the lot
  • Test summary per lot and per layer

Quantities & dockets

Tonnes and square metres you can actually prove.

Dockets from the quarry, asphalt plant and carriers are captured as they arrive and matched to the truck, material and lot. Survey quantities sit alongside so you can see what's placed against design without a spreadsheet marathon.

  • Docket photos or supplier imports
  • Matched to truck, material and lot
  • Unmatched dockets flagged daily
  • Survey quantities from 12d or TBC exports
  • Placed versus design per lot
  • Tonnes, cubes, m² and lineal metres
  • Supplier invoices checked against dockets
  • Cartage and hire hours captured

Progress claims

Claims built from closed lots, not hope.

Every claim line is backed by lots that are closed, tested and released. Variations and dayworks sit beside the contract items so nothing done on site goes unclaimed.

  • Claim lines linked to schedule items
  • Only closed lots counted as complete
  • Evidence attached to every line
  • Variations with photos and approvals
  • Dayworks from plant and labour logs
  • Claim history and cumulative totals
  • Export for Payapps or the principal's format
  • Invoices pushed to Xero or MYOB

Site diaries & plant

The daily diary gets written on the day.

Foremen fill in the diary from their phone while it's fresh: weather, labour, plant, deliveries, visitors and delays. Operators log pre-starts and hours from the cab. When an extension of time comes up the record is already there.

  • Daily diary on any phone
  • Weather and delay logging
  • Labour and subcontractor headcounts
  • Plant on site and hours worked
  • Operator pre-starts and defects
  • Photos tagged to lots and chainage
  • Deliveries and visitors logged
  • Diary history searchable by date
  • NCRs raised straight from the diary
04How it changes

Before and after

A lot closed out, wolloped.

Here's how closing a basecourse lot could change. Every road builder runs things a bit differently, so we map yours first.

Before

  1. Update the lot spreadsheet back at the site office
  2. Dig the density results out of a lab email
  3. Crew waits while someone chases the hold point release
  4. Add up tonnes from a stack of dockets
  5. Scan the ticked ITP from the folder in the ute
  6. Argue the quantity at claim time

After

  1. Lot register updates from site as work happens
  2. Test results land on the lot and show a pass
  3. Release requested and signed off on a phone
  4. Tonnes already matched from the dockets
  5. ITP ticked on site with photos attached
  6. Claim line backed by the closed lot
05Services

Everything under one roof

Software, websites and systems for road builders.

Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.

Custom software for road builders

Built around how your road construction company actually runs: lot register, iTP manager and the admin in between, in one system you own.

Websites for road builders

Fast, hand-built websites that rank for the searches your customers make and turn visits into enquiries, bookings or orders.

Road construction company system upgrades

Running on spreadsheets, old software or a platform you've outgrown? We move your data across and upgrade in stages so the business never stops.

Apps and portals for road builders

Test tracking and hold & witness points: customer and staff portals that work on any phone without an app store.

Integrations and automation

We connect 12d Model, Trimble Business Center and Assignar so information moves on its own and nobody retypes it.

Hosting, support and care

Managed hosting, updates, backups and security for your road construction company, looked after by the people who built it.

06Integrations

Connections

Plays nicely with what you already use.

We connect to the survey, plant, project and accounting tools you rely on. If one is holding you back we'll show you what replacing it involves.

  • 12d Model
  • Trimble Business Center
  • Assignar
  • Procore
  • Aconex
  • Payapps
  • HammerTech
  • Teletrac Navman
  • Xero
  • MYOB
  • Microsoft 365
  • Google Workspace
  • Dropbox
  • Deputy
  • Stripe
  • Twilio SMS
  • Google Maps
07How we work

The process

Some people dip their toe in. We turn up in a rebreather.

We get properly below the surface of your road construction company: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.

  1. 01

    Think

    We spend time on site with your foremen and in the office with your engineers to see where lots, tests and dockets actually get stuck.

  2. 02

    Archi-tech

    We plan it before writing code: your lot structure, ITPs, specs, test types, claim format, integrations, hosting and cost.

  3. 03

    Build

    Real engineering, shown to you early and often. Usually the lot register and test tracking first, so you get a win before the next claim.

  4. 04

    Look after

    We host it, maintain it and keep improving it. When something breaks you call the people who built it.

08Questions

FAQ

Things road builders ask us.

Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.

Can it work with our survey, plant and accounting software?

Usually, yes. We can bring in survey data from 12d Model or Trimble Business Center exports, connect to Xero or MYOB for accounts and link with tools like Assignar for plant and crews. Each lot then pulls the right numbers without retyping.

Can it handle the specs we work to?

Yes. We set up your ITP templates and test limits against the specs on your jobs, whether that's TMR's MRTS, Transport for NSW QA specs or a council's own spec. Different jobs can run different templates.

Can lab results come in automatically?

Where your lab can send results electronically we bring them straight in. Otherwise lab reports are emailed to a job address and attached to the right lot, so nobody is digging through inboxes.

Will it work on site with bad reception?

Yes. Foremen and engineers can fill in ITPs, diaries and dockets with no signal. Everything syncs once the phone finds coverage again.

Can the superintendent or principal see it?

Yes. We can give them their own login to view lots, test results and closeout packs and to release hold points, without seeing your rates or internal notes.

We already use Procore or Assignar. Do we have to switch?

No. If a platform is doing its job we build around it and fill the gaps, like lots, tests and quantities. If something is holding you back we'll show you what replacing it would involve before anything changes.

How much does a road construction system cost?

It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.

How long does it take?

We build in stages. The lot register and test tracking can be up and running early so you get the first win on a live job. Claims, dockets and diaries follow on.

Who looks after it once it's built?

We do. We host it on our own managed servers and keep it updated, backed up and secure. When you need something you ring the people who built it.

We already have systems. Can you upgrade them instead of starting again?

Usually, yes. We keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.

Contact

Got a road construction company problem? Consider it wolloped.

Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.