Removal plan builder
Asbestos removal control plans drafted from the job details, with your methods, enclosures and decon setups ready to pick from.
Asbestos removal: every record ready for the regulator. Strip the roof, not the filing cabinet.
Removal plans get rewritten in Word for every job. The five-day notice lives in a diary, air monitoring results sit in someone's inbox and clearance certificates turn up in a folder when you're lucky. We build plan, compliance, waste and job systems for asbestos removalists that keep every record together, then we host them and look after them.
Asbestos removal is a trade where the paperwork matters as much as the work. Every licensed job needs a removal control plan, a notification to the regulator, a SWMS, air monitoring for friable work, a clearance inspection and proof the waste went to a licensed facility. Most removalists hold it together with Word templates, a shared drive, a few email threads and a supervisor who remembers everything.
Wollopit builds custom software around how your crews actually work. Enter the job once and the plan drafts itself. Notifications get tracked with reminders. Monitoring and clearances attach to the job the moment they arrive and waste dockets get photographed on site. When a builder, a client or an inspector asks for the file, it's one click. We connect to the tools you already use and host the lot on our own servers.
What we hear from asbestos removalists
Most asbestos removalists we talk to do careful, safe work on site and then lose hours every week chasing the records that prove it.
Solutions
Pick the one that's hurting most or join the whole lot up. Everything is built around how your team works, not the other way round.
Asbestos removal control plans drafted from the job details, with your methods, enclosures and decon setups ready to pick from.
Regulator notifications per job with lodgement dates, reference numbers and reminders so no crew starts early.
Photos, measurements, material types and sample IDs captured on a phone, then turned into a branded quote.
Every sample logged from bag to NATA lab result, matched to the job and shared with the client.
Daily monitoring results from your assessor attached to the job, with readings logged and exceedances flagged.
Every clearance stored by job, address and client, searchable in seconds and downloadable through a portal.
Licences, supervisor tickets, fit tests, medicals and inductions with expiry alerts and rostering checks.
SWMS sign-ons, prestarts, enclosure smoke tests, decon logs and PPE checks filled in on site.
Loads, weights, facilities, docket photos and waste tracking references recorded for every job.
A shared calendar for crews, utes, skips and negative air units, mapped so the runs make sense.
Builders, homeowners, schools and insurers see job status and download plans, clearances and reports.
The full compliance file for any job exported in one go when the regulator or a principal contractor asks.
Hand-built, quick on mobile and built to rank for 'asbestos removal near me' and your local area.
The big ones
These are the systems asbestos removalists ask us about most. Each one works on its own and they get properly useful once they're joined up.
Plans & notifications
Site details, materials, licence class and quantities go in once from the inspection. The removal control plan drafts itself from your own templates and methods. The regulator notification gets tracked with reminders so the start date never sneaks up on you.
Monitoring & clearances
Air monitoring results attach to the job and the day they were taken, whether your assessor uploads them or you forward the email. Clearance certificates land on the same file and the client can download theirs the moment the job's signed off.
Worker compliance
Every worker's licences, supervisor certificates, fit tests, medicals and inductions in one register. Expiry alerts go out well before the date. When you roster a crew the system checks everyone is qualified for that class of work.
Waste & disposal
Crews log each load from the site: what it is, how much and where it went. Weighbridge dockets get photographed on the spot and waste tracking references stay on the job so the disposal side of the file is never missing.
Jobs, quotes & portal
Enquiries come in from the phone, website and insurers and land on one board. Site inspections become quotes. Accepted quotes become scheduled jobs with the right crew and gear. Builders and clients log in to see where things are up to and grab their paperwork.
Before and after
Here's how a school holiday job could change. Every removal business runs a bit differently, so we map yours first.
Everything under one roof
Whether you're starting fresh or upgrading what you've got, it's one team from the first sketch to the support call.
Built around how your asbestos removal business actually runs: removal plan builder, notification tracker and the admin in between, in one system you own.
Fast, hand-built websites that rank for the searches your customers make and turn visits into enquiries, bookings or orders.
Running on spreadsheets, old software or a platform you've outgrown? We move your data across and upgrade in stages so the business never stops.
Site inspection & quoting and sample tracking: customer and staff portals that work on any phone without an app store.
We connect Xero, MYOB and ServiceM8 so information moves on its own and nobody retypes it.
Managed hosting, updates, backups and security for your asbestos removal business, looked after by the people who built it.
Connections
We connect to the tools you rely on, work alongside job management platforms you're happy with or replace the ones holding you back.
The process
We get properly below the surface of your asbestos removal business: the systems, the busy days and the jobs everyone hates. Then we fix the bits that matter most first.
We spend time on site, in the ute and in the office, then work out where the paperwork is actually slowing you down.
We plan it before writing code: your plans, notifications, monitoring, clearances, crews, waste, hosting and cost.
Real engineering, shown to you early and often. Usually the most painful record first, so you get a win before the next big job.
We host it, maintain it and keep improving it. When something breaks you call the people who built it.
FAQ
Something else on your mind? Ring 0423 011 252 and ask the people who'd build it.
Yes. Builders, homeowners, schools and insurers can log in to a portal and download their clearances, plans and monitoring reports once the job is signed off.
It drafts them from the job details using your own templates, methods and wording. Your supervisor still reviews and signs each one, it just stops you starting from a blank page.
You still lodge through your state regulator's system. We track every notification on the job with the reference number and remind you before the start date so nothing gets missed.
Yes. The worker register knows every ticket, fit test and medical. When you roster a crew it checks they're qualified for that class of work and flags anything expired.
We can build the site forms to work without reception and sync once the crew is back in range.
No. If your job management platform is doing its job we build around it: the plans, compliance records, waste tracking and portal sit alongside and talk to it. If it's holding you back we'll show you what replacing it involves before anything changes.
It depends on what you need, so we quote up front once we understand it. No surprise invoices, no lock-in and you own what we build.
Smaller pieces like a clearance register or worker compliance register can be quick. Bigger systems are planned in stages so you get the first win early instead of waiting for everything at once.
We do. We host it on our own managed servers and keep it updated, backed up and secure. When you need something you ring the people who built it.
Usually, yes. Most asbestos removalists we work with keep what's working and upgrade the rest in stages. We move your data across, connect the old and new while we switch and retire the old system only when the new one is proven.
Contact
Tell us what's slow, broken, manual or missing. You don't need a spec, just describe what's going on.